I've looked at at least 2 dozen topics about this and haven't really found a good answer yet, so I come to you to ask once again for answers regarding the dreaded topic of Repeating Events.
I've got Daily, Weekly, Monthly, and Yearly repeats working out fine for now (I still need to revamp the system with Exception events and whatnot, but it works for the time being). But, we want to be able to add the ability to repeat events on the (1st,2nd,3rd,4th,5th) [Sun|Mon|Tue|Wed|Thu|Fri|Sat] of every month, every other month, and every three months.
Now, if I can just understand the logic for the every month, I can figure out the every other month and the every three months.
Here's a bit of what I have so far (note: I'm not saying I have the best way of doing it or anything, but the system is one we update very slowly over time when we aren't busy with other projects, so I make the code more efficient as I have the time).
First I get the starting and ending dates formatted for date calculations:
$ending = $_POST['end_month'] . "/" . $_POST['end_day'] . "/" . substr($_POST['end_year'], 2, 2);
$starting = $_POST['month'] . "/" . $_POST['day'] . "/" . substr($_POST['year'], 2, 2);
Then I get the difference between those two to know how many times to repeat using a function I'm fairly certain I found on here some time ago and dividing that amount by 28 days to get just about how many TIMES it needs to repeat so that there is one a month:
$repeat_number = date_diff($starting, $ending) / 28;
//find the difference in DAYS between the two dates
function date_diff($old_date, $new_date) {
$offset = strtotime($new_date) - strtotime($old_date);
return $offset/60/60/24;
}
Then I add the (1st,2nd,etc...) part to the [Sun|Mon|etc...] part to figure out what they are looking for giving me somehthing like 'first Sunday' :
$find = $_POST['custom_number']. ' ' . $_POST['custom_day'];
Then I use a loop that runs the number of times this needs to repeat (the $repeat_number from above):
for($m = 0; $m <= $repeat_number; $m++) {
if($m == 0) {
$month = date('F', substr($starting,0,2));
} else {
$month = date('F', strtotime($month . ' + ' . $m . ' months'));
}
$repeat_date = strtotime($find . ' in ' . $month);
}
Now, I'm aware this code doesn't work, I at one time did have code that turned up the correct month and year for the repeat, but wouldn't necessarily find the first tuesday or whatever it was that was being looked for.
If anyone could point me back in the right direction, it would be most appreciated. I've been lurking in the community for some time now, just started trying to actively participate recently.
Thanks in advance for any input or advice you can provide.
Here's a possible alternative for you. strtotime is powerful, and the syntax includes really useful bits like comprehensive relative time and date wording.
You can use it to generate the first through Nth specific weekdays of a specific month by using the format " of ". Here's an example using date_create to invoke a DateTime object, but regular old strtotime works the same way:
php > $d = date_create('Last Friday of March 2011'); if($d instanceof DateTime) echo $d->format('l F d Y H:i:s');
Friday March 25 2011 00:00:00
php > $d = date_create('First Friday of March 2011'); if($d instanceof DateTime) echo $d->format('l F d Y H:i:s');
Friday March 04 2011 00:00:00
php > $d = date_create('First Sunday of March 2011'); if($d instanceof DateTime) echo $d->format('l F d Y H:i:s');
Sunday March 06 2011 00:00:00
php > $d = date_create('Fourth Sunday of March 2011'); if($d instanceof DateTime) echo $d->format('l F d Y H:i:s');
Sunday March 27 2011 00:00:00
php > $d = date_create('Last Sunday of March 2011'); if($d instanceof DateTime) echo $d->format('l F d Y H:i:s');
Sunday March 27 2011 00:00:00
It will also overflow the month, if you ask for an invalid one:
php > $d = date_create('Ninth Sunday of March 2011'); if($d instanceof DateTime) echo $d->format('l F d Y H:i:s');
Sunday May 01 2011 00:00:00
Note that it only works with the ordinal number wording. You can't pass "1st" or "3rd", unfortunately.
Once you use this to grab the proper Nth weekday, you can then simply add the number of needed weekdays to skip (7 for one week, 14 for two, 21 for three, etc) as required until the designated end date or designated number of weeks has passed. Once again, strtotime to the rescue, using the second argument to chain together relativeness:
php > echo date('l F d Y H:i:s', strtotime('+14 days', strtotime('First Thursday of March 2011')));
Thursday March 17 2011 00:00:00
(My local copy also accepted '+14 days First Thursday of March 2011', but that felt kind of weird.)
I have a more simple method, although it may seem hack-ish.
What we can do is take the start date, and infer it's "n" value from it by taking the ceiling of its day divided by 7.
For example, if your start date is the 18th, we divide by 7 and take the ceiling to infer that it is the 3rd "whatever-day" of the month.
From there we can simply repeatedly add 7 days to this to get a new date, and whenever the new date's ceilinged 7-quotient is 3, we've hit the next "nth whatever-day" of the month.
Some code can be seen below:
$day_nth = ceil(date("j", strtotime($date))/7);
for ($i = 0; $i < $number_of_repeats; $i++) {
while (ceil(date("j", strtotime($date))/7) != $day_nth)
$date = date("Y-m-d", strtotime("+7 days", strtotime($date)));
/* Add your event, or whatever */
/* Now we increment date by 7 days before the loop starts again,
** otherwise the while loop would never execute and we'd just be
** adding to the same date repeatedly. */
$date = date("Y-m-d", strtotime("+7 days", strtotime($date)));
}
What's nice about this method is that we don't even have to concern ourselves with which day of the week we're dealing with. We just infer everything from the start date and away we go.
I make it like that:
//$typeOfDate = 0;
$typeOfDate = 1;
$day = strtotime("2013-02-01");
$to = strtotime(date("Y-m-d", $day) . " +6 month");
if ($typeOfDate == 0) { //use the same day (number) of the month
$dateArray[] = date("Y-m-d", $day);
$event_day_number = date("d", $day);
while ($day <= $to) {
$nextMonth = date("m", get_x_months_to_the_future($day));
$day = strtotime(date("Y-" . $nextMonth . "-d", $day));
$dateArray[] = date("Y-m-d", $day);
}
}
if ($typeOfDate == 0) { //use the same day (like friday) of the month
$dateArray[] = date("Y-m-d", $day);
$monthEvent = date("m", $day);
$day = strtotime(date("Y-m-d", $day) . " +4 weeks");
$newMonthEvent = date("m", $day);
if ($monthEvent == $newMonthEvent) {
$day = strtotime(date("Y-m-d", $day) . " +7 days");
}
while ($day <= $to) {
$dateArray[] = date("Y-m-d", $day);
$monthEvent = date("m", $day);
$day = strtotime(date("Y-m-d", $day) . " +4 weeks");
$newMonthEvent = date("m", $day);
if ($monthEvent == $newMonthEvent) {
$day = strtotime(date("Y-m-d", $day) . " +7 days");
}
}
}
Related
I wonder if it is possible to get this as an ouput using PHP DateTime:
'first thursday of February 2021'
The other way round were
$date = new DateTime('first thursday of February 2021');
What I have to accomplish: I have a given date and want to know, if it is the first thursday or not without building the date and comparing dates after this like:
$date = new DateTime('first thursday of February 2021');
$given_date = new DateTime('2021-02-04');
return ($given_date == $date);
Anyone?
I forgot: my given date can be the second saturday in march or the third friday in june and so on.
I will explain a little further for those who doesn't understand my question. Imaging a time table which says: all thursdays office is open from 8am to 5pm but first thursday in march office will open at 7am and closes at 6pm. Now a customer wants to schedule a meeting and we have only a date but must know: is it the first thursday or not. My database holds such information like day, month and possibly position in month. My solution now is a loop to determine the position in month.
private function getPositionInMonth(DateTime $date)
{
$positions = ['first', 'second', 'third', 'fourth', 'fifth'];
$day_name = $date->format('l');
foreach ($positions as $i => $position) {
$str = $position . ' ' . $day_name . ' ' . $date->format('F') . ' ' . $date->format('Y');
$test_date = new DateTime($str);
if ($test_date->format('d.m.Y') == $date->format('d.m.Y')) {
return ($i + 1);
}
}
}
All other information can be fetched in the sql query.
A DateTime object should be formatted as a string like "first thursday of February 2021".
function formatNoWeekday(Datetime $date){
$no = ['first','second','third','fourth','fifth'];
$day = $date->format('j');
$frm = $date->format(' l \o\f F Y');
foreach($no as $n){
$strDate = $n.$frm;
if(date_create($strDate)->format('j') == $day){
return $strDate;
}
}
return false;
}
$result = formatNoWeekday(date_create('2021-02-16'));
//"third Tuesday of February 2021"
Solved it with a tiny bit of math like CBroe suggested:
private function getPositionInMonth(DateTime $date)
{
$test_date = new DateTime($date->format('Y-m-') . '01');
$diff = round(($date->getTimestamp() - $test_date->getTimestamp()) / 86400, 0);
if($diff < 7) {
return 1;
}
return (int)($diff / 7) + 1;
}
That function will give the position in month.
(Diff calculation fixed, DateTime gives d=0 and m=1 for the 29th of march, now it works. If you find any date which fails please mention it)
DateTime object supports relative formats. For this you can call method modify
<?php
$date = new DateTime('now');
$date->modify('first thursday of February 2021');
$given_date = new DateTime('2021-02-04');
return ($given_date == $date);
DateTime::modify
Relative Formats
Say I wanted to get the week beginning and ending, for example:
Mon 29th June - week start
Sun 5th July - week end
and then tomorrow (Mon 6th July) it will say:
Mon 6th July - week start
Sun 12th July - week end
Is this the right way to do it?
$week_start = date('Y-m-d', strtotime('last monday'));
$week_end = date('Y-m-d', strtotime('this sunday'));
DateTime class has this nice method called setIsoDate():
$start = new DateTime();
$start->setIsoDate($start->format('o'), $start->format('W'));
$end = clone $start;
$end->modify('+6 day');
echo "From: " . $start->format('Y-m-d') . " to: " . $end->format('Y-m-d');
demo
That would not work properly if the current date is Monday. last monday would then translate to the Monday the previous week.
I would use this syntax instead:
$week_start = date('Y-m-d', strtotime('last monday', strtotime('tomorrow')));
$week_end = date('Y-m-d', strtotime('this sunday'));
You might also consider avoiding those "advanced" relative formats, and seek the correct dates based on the current weekday. Might be a bit more reliable, as those week formats don't always seem to behave as one might expect, and the logic behind them isn't readily available.
This solution uses simpler strtotime formats, and instead puts the seek logic in the code itself. As such, it's a lot more predictable, if a little less elegant.
$weekday = date("N"); // 1 = Monday, 7 = Sunday
$week_start = date("Y-m-d", strtotime("-" . ($weekday - 1) . " days"));
$week_end = date("Y-m-d", strtotime("+" . (7 - $weekday) . " days"));
Note that the date("N") flag is only available in PHP 5.1 and later. For older version you'd need to use date("w"), and move the Sunday value to the back.
$weekday = date("w"); // 0 = Sunday, 6 = Saturday
if ($weekday == 0) {
$weekday = 7;
}
How can I calculate the day of month in PHP with giving month, year, day of week and number of week.
Like, if I have September 2013 and day of week is Friday and number of week is 2, I should get 6. (9/6/2013 is Friday on the 2nd week.)
One way to achieve this is using relative formats for strtotime().
Unfortunately, it's not as straightforward as:
strtotime('Friday of second week of September 2013');
In order for the weeks to work as you mentioned, you need to call strtotime() again with a relative timestamp.
$first_of_month_timestamp = strtotime('first day of September 2013');
$second_week_friday = strtotime('+1 week, Friday', $first_of_month_timestamp);
echo date('Y-m-d', $second_week_friday); // 2013-09-13
Note: Since the first day of the month starts on week one, I've decremented the week accordingly.
I was going to suggest to just use strtotime() in this fashion:
$ts = strtotime('2nd friday of september 2013');
echo date('Y-m-d', $ts), PHP_EOL;
// outputs: 2013-09-13
It seems that this is not how you want the calendar to behave? But it is following a (proper) standard :)
This way its a little longer and obvious but it works.
/* INPUT */
$month = "September";
$year = "2013";
$dayWeek= "Friday";
$week = 2;
$start = strtotime("{$year}/{$month}/1"); //get first day of that month
$result = false;
while(true) { //loop all days of month to find expected day
if(date("w", $start) == $week && date("l", $start) == $dayWeek) {
$result = date("d", $start);
break;
}
$start += 60 * 60 * 24;
}
var_dump($result); // string(2) "06"
I've been working a lot with the DateTime class and recently ran into what I thought was a bug when adding months. After a bit of research, it appears that it wasn't a bug, but instead working as intended. According to the documentation found here:
Example #2 Beware when adding or
subtracting months
<?php
$date = new DateTime('2000-12-31');
$date->modify('+1 month');
echo $date->format('Y-m-d') . "\n";
$date->modify('+1 month');
echo $date->format('Y-m-d') . "\n";
?>
The above example will output:
2001-01-31
2001-03-03
Can anyone justify why this isn't considered a bug?
Furthermore does anyone have any elegant solutions to correct the issue and make it so +1 month will work as expected instead of as intended?
Why it's not a bug:
The current behavior is correct. The following happens internally:
+1 month increases the month number (originally 1) by one. This makes the date 2010-02-31.
The second month (February) only has 28 days in 2010, so PHP auto-corrects this by just continuing to count days from February 1st. You then end up at March 3rd.
How to get what you want:
To get what you want is by: manually checking the next month. Then add the number of days next month has.
I hope you can yourself code this. I am just giving what-to-do.
PHP 5.3 way:
To obtain the correct behavior, you can use one of the PHP 5.3's new functionality that introduces the relative time stanza first day of. This stanza can be used in combination with next month, fifth month or +8 months to go to the first day of the specified month. Instead of +1 month from what you're doing, you can use this code to get the first day of next month like this:
<?php
$d = new DateTime( '2010-01-31' );
$d->modify( 'first day of next month' );
echo $d->format( 'F' ), "\n";
?>
This script will correctly output February. The following things happen when PHP processes this first day of next month stanza:
next month increases the month number (originally 1) by one. This makes the date 2010-02-31.
first day of sets the day number to 1, resulting in the date 2010-02-01.
Here is another compact solution entirely using DateTime methods, modifying the object in-place without creating clones.
$dt = new DateTime('2012-01-31');
echo $dt->format('Y-m-d'), PHP_EOL;
$day = $dt->format('j');
$dt->modify('first day of +1 month');
$dt->modify('+' . (min($day, $dt->format('t')) - 1) . ' days');
echo $dt->format('Y-m-d'), PHP_EOL;
It outputs:
2012-01-31
2012-02-29
This may be useful:
echo Date("Y-m-d", strtotime("2013-01-01 +1 Month -1 Day"));
// 2013-01-31
echo Date("Y-m-d", strtotime("2013-02-01 +1 Month -1 Day"));
// 2013-02-28
echo Date("Y-m-d", strtotime("2013-03-01 +1 Month -1 Day"));
// 2013-03-31
echo Date("Y-m-d", strtotime("2013-04-01 +1 Month -1 Day"));
// 2013-04-30
echo Date("Y-m-d", strtotime("2013-05-01 +1 Month -1 Day"));
// 2013-05-31
echo Date("Y-m-d", strtotime("2013-06-01 +1 Month -1 Day"));
// 2013-06-30
echo Date("Y-m-d", strtotime("2013-07-01 +1 Month -1 Day"));
// 2013-07-31
echo Date("Y-m-d", strtotime("2013-08-01 +1 Month -1 Day"));
// 2013-08-31
echo Date("Y-m-d", strtotime("2013-09-01 +1 Month -1 Day"));
// 2013-09-30
echo Date("Y-m-d", strtotime("2013-10-01 +1 Month -1 Day"));
// 2013-10-31
echo Date("Y-m-d", strtotime("2013-11-01 +1 Month -1 Day"));
// 2013-11-30
echo Date("Y-m-d", strtotime("2013-12-01 +1 Month -1 Day"));
// 2013-12-31
My solution to the problem:
$startDate = new \DateTime( '2015-08-30' );
$endDate = clone $startDate;
$billing_count = '6';
$billing_unit = 'm';
$endDate->add( new \DateInterval( 'P' . $billing_count . strtoupper( $billing_unit ) ) );
if ( intval( $endDate->format( 'n' ) ) > ( intval( $startDate->format( 'n' ) ) + intval( $billing_count ) ) % 12 )
{
if ( intval( $startDate->format( 'n' ) ) + intval( $billing_count ) != 12 )
{
$endDate->modify( 'last day of -1 month' );
}
}
I agree with the sentiment of the OP that this is counter-intuitive and frustrating, but so is determining what +1 month means in the scenarios where this occurs. Consider these examples:
You start with 2015-01-31 and want to add a month 6 times to get a scheduling cycle for sending an email newsletter. With the OP's initial expectations in mind, this would return:
2015-01-31
2015-02-28
2015-03-31
2015-04-30
2015-05-31
2015-06-30
Right away, notice that we are expecting +1 month to mean last day of month or, alternatively, to add 1 month per iteration but always in reference to the start point. Instead of interpreting this as "last day of month" we could read it as "31st day of next month or last available within that month". This means that we jump from April 30th to May 31st instead of to May 30th. Note that this is not because it is "last day of month" but because we want "closest available to date of start month."
So suppose one of our users subscribes to another newsletter to start on 2015-01-30. What is the intuitive date for +1 month? One interpretation would be "30th day of next month or closest available" which would return:
2015-01-30
2015-02-28
2015-03-30
2015-04-30
2015-05-30
2015-06-30
This would be fine except when our user gets both newsletters on the same day. Let's assume that this is a supply-side issue instead of demand-side We're not worried that the user will be annoyed with getting 2 newsletters in the same day but instead that our mail servers can't afford the bandwidth for sending twice as many newsletters. With that in mind, we return to the other interpretation of "+1 month" as "send on the second to last day of each month" which would return:
2015-01-30
2015-02-27
2015-03-30
2015-04-29
2015-05-30
2015-06-29
Now we've avoided any overlap with the first set, but we also end up with April and June 29th, which certainly does match our original intuitions that +1 month simply should return m/$d/Y or the attractive and simple m/30/Y for all possible months. So now let's consider a third interpretation of +1 month using both dates:
Jan. 31st
2015-01-31
2015-03-03
2015-03-31
2015-05-01
2015-05-31
2015-07-01
Jan. 30th
2015-01-30
2015-03-02
2015-03-30
2015-04-30
2015-05-30
2015-06-30
The above has some issues. February is skipped, which could be a problem both supply-end (say if there is a monthly bandwidth allocation and Feb goes to waste and March gets doubled up on) and demand-end (users feel cheated out of Feb and perceive the extra March as attempt to correct mistake). On the other hand, notice that the two date sets:
never overlap
are always on the same date when that month has the date (so the Jan. 30 set looks pretty clean)
are all within 3 days (1 day in most cases) of what might be considered the "correct" date.
are all at least 28 days (a lunar month) from their successor and predecessor, so very evenly distributed.
Given the last two sets, it would not be difficult to simply roll back one of the dates if it falls outside of the actual following month (so roll back to Feb 28th and April 30th in the first set) and not lose any sleep over the occasional overlap and divergence from the "last day of month" vs "second to last day of month" pattern. But expecting the library to choose between "most pretty/natural", "mathematical interpretation of 02/31 and other month overflows", and "relative to first of month or last month" is always going to end with someone's expectations not being met and some schedule needing to adjust the "wrong" date to avoid the real-world problem that the "wrong" interpretation introduces.
So again, while I also would expect +1 month to return a date that actually is in the following month, it is not as simple as intuition and given the choices, going with math over the expectations of web developers is probably the safe choice.
Here's an alternative solution that is still as clunky as any but I think has nice results:
foreach(range(0,5) as $count) {
$new_date = clone $date;
$new_date->modify("+$count month");
$expected_month = $count + 1;
$actual_month = $new_date->format("m");
if($expected_month != $actual_month) {
$new_date = clone $date;
$new_date->modify("+". ($count - 1) . " month");
$new_date->modify("+4 weeks");
}
echo "* " . nl2br($new_date->format("Y-m-d") . PHP_EOL);
}
It's not optimal but the underlying logic is : If adding 1 month results in a date other than the expected next month, scrap that date and add 4 weeks instead. Here are the results with the two test dates:
Jan. 31st
2015-01-31
2015-02-28
2015-03-31
2015-04-28
2015-05-31
2015-06-28
Jan. 30th
2015-01-30
2015-02-27
2015-03-30
2015-04-30
2015-05-30
2015-06-30
(My code is a mess and wouldn't work in a multi-year scenario. I welcome anyone to rewrite the solution with more elegant code so long as the underlying premise is kept intact, i.e. if +1 month returns a funky date, use +4 weeks instead.)
In conjunction with shamittomar's answer, it could then be this for adding months "safely":
/**
* Adds months without jumping over last days of months
*
* #param \DateTime $date
* #param int $monthsToAdd
* #return \DateTime
*/
public function addMonths($date, $monthsToAdd) {
$tmpDate = clone $date;
$tmpDate->modify('first day of +'.(int) $monthsToAdd.' month');
if($date->format('j') > $tmpDate->format('t')) {
$daysToAdd = $tmpDate->format('t') - 1;
}else{
$daysToAdd = $date->format('j') - 1;
}
$tmpDate->modify('+ '. $daysToAdd .' days');
return $tmpDate;
}
I made a function that returns a DateInterval to make sure that adding a month shows the next month, and removes the days into the after that.
$time = new DateTime('2014-01-31');
echo $time->format('d-m-Y H:i') . '<br/>';
$time->add( add_months(1, $time));
echo $time->format('d-m-Y H:i') . '<br/>';
function add_months( $months, \DateTime $object ) {
$next = new DateTime($object->format('d-m-Y H:i:s'));
$next->modify('last day of +'.$months.' month');
if( $object->format('d') > $next->format('d') ) {
return $object->diff($next);
} else {
return new DateInterval('P'.$months.'M');
}
}
This is an improved version of Kasihasi's answer in a related question. This will correctly add or subtract an arbitrary number of months to a date.
public static function addMonths($monthToAdd, $date) {
$d1 = new DateTime($date);
$year = $d1->format('Y');
$month = $d1->format('n');
$day = $d1->format('d');
if ($monthToAdd > 0) {
$year += floor($monthToAdd/12);
} else {
$year += ceil($monthToAdd/12);
}
$monthToAdd = $monthToAdd%12;
$month += $monthToAdd;
if($month > 12) {
$year ++;
$month -= 12;
} elseif ($month < 1 ) {
$year --;
$month += 12;
}
if(!checkdate($month, $day, $year)) {
$d2 = DateTime::createFromFormat('Y-n-j', $year.'-'.$month.'-1');
$d2->modify('last day of');
}else {
$d2 = DateTime::createFromFormat('Y-n-d', $year.'-'.$month.'-'.$day);
}
return $d2->format('Y-m-d');
}
For example:
addMonths(-25, '2017-03-31')
will output:
'2015-02-28'
I found a shorter way around it using the following code:
$datetime = new DateTime("2014-01-31");
$month = $datetime->format('n'); //without zeroes
$day = $datetime->format('j'); //without zeroes
if($day == 31){
$datetime->modify('last day of next month');
}else if($day == 29 || $day == 30){
if($month == 1){
$datetime->modify('last day of next month');
}else{
$datetime->modify('+1 month');
}
}else{
$datetime->modify('+1 month');
}
echo $datetime->format('Y-m-d H:i:s');
Here is an implementation of an improved version of Juhana's answer in a related question:
<?php
function sameDateNextMonth(DateTime $createdDate, DateTime $currentDate) {
$addMon = clone $currentDate;
$addMon->add(new DateInterval("P1M"));
$nextMon = clone $currentDate;
$nextMon->modify("last day of next month");
if ($addMon->format("n") == $nextMon->format("n")) {
$recurDay = $createdDate->format("j");
$daysInMon = $addMon->format("t");
$currentDay = $currentDate->format("j");
if ($recurDay > $currentDay && $recurDay <= $daysInMon) {
$addMon->setDate($addMon->format("Y"), $addMon->format("n"), $recurDay);
}
return $addMon;
} else {
return $nextMon;
}
}
This version takes $createdDate under the presumption that you are dealing with a recurring monthly period, such as a subscription, that started on a specific date, such as the 31st. It always takes $createdDate so late "recurs on" dates won't shift to lower values as they are pushed forward thru lesser-valued months (e.g., so all 29th, 30th or 31st recur dates won't eventually get stuck on the 28th after passing thru a non-leap-year February).
Here is some driver code to test the algorithm:
$createdDate = new DateTime("2015-03-31");
echo "created date = " . $createdDate->format("Y-m-d") . PHP_EOL;
$next = sameDateNextMonth($createdDate, $createdDate);
echo " next date = " . $next->format("Y-m-d") . PHP_EOL;
foreach(range(1, 12) as $i) {
$next = sameDateNextMonth($createdDate, $next);
echo " next date = " . $next->format("Y-m-d") . PHP_EOL;
}
Which outputs:
created date = 2015-03-31
next date = 2015-04-30
next date = 2015-05-31
next date = 2015-06-30
next date = 2015-07-31
next date = 2015-08-31
next date = 2015-09-30
next date = 2015-10-31
next date = 2015-11-30
next date = 2015-12-31
next date = 2016-01-31
next date = 2016-02-29
next date = 2016-03-31
next date = 2016-04-30
$ds = new DateTime();
$ds->modify('+1 month');
$ds->modify('first day of this month');
If you just want to avoid skipping a month you can perform something like this to get the date out and run a loop on the next month reducing the date by one and rechecking until a valid date where $starting_calculated is a valid string for strtotime (i.e. mysql datetime or "now"). This finds the very end of the month at 1 minute to midnight instead of skipping the month.
$start_dt = $starting_calculated;
$next_month = date("m",strtotime("+1 month",strtotime($start_dt)));
$next_month_year = date("Y",strtotime("+1 month",strtotime($start_dt)));
$date_of_month = date("d",$starting_calculated);
if($date_of_month>28){
$check_date = false;
while(!$check_date){
$check_date = checkdate($next_month,$date_of_month,$next_month_year);
$date_of_month--;
}
$date_of_month++;
$next_d = $date_of_month;
}else{
$next_d = "d";
}
$end_dt = date("Y-m-$next_d 23:59:59",strtotime("+1 month"));
Extension for DateTime class which solves problem of adding or subtracting months
https://gist.github.com/66Ton99/60571ee49bf1906aaa1c
If using strtotime() just use $date = strtotime('first day of +1 month');
I needed to get a date for 'this month last year' and it becomes unpleasant quite quickly when this month is February in a leap year. However, I believe this works... :-/ The trick seems to be to base your change on the 1st day of the month.
$this_month_last_year_end = new \DateTime();
$this_month_last_year_end->modify('first day of this month');
$this_month_last_year_end->modify('-1 year');
$this_month_last_year_end->modify('last day of this month');
$this_month_last_year_end->setTime(23, 59, 59);
$month = 1; $year = 2017;
echo date('n', mktime(0, 0, 0, $month + 2, -1, $year));
will output 2 (february). will work for other months too.
$current_date = new DateTime('now');
$after_3_months = $current_date->add(\DateInterval::createFromDateString('+3 months'));
For days:
$after_3_days = $current_date->add(\DateInterval::createFromDateString('+3 days'));
Important:
The method add() of DateTime class modify the object value so after calling add() on a DateTime Object it returns the new date object and also it modify the object it self.
you can actually do it with just date() and strtotime() as well. For example to add 1 month to todays date:
date("Y-m-d",strtotime("+1 month",time()));
if you are wanting to use the datetime class thats fine too but this is just as easy. more details here
$date = date('Y-m-d', strtotime("+1 month"));
echo $date;
Let's say I have a date in the following format: 2010-12-11 (year-mon-day)
With PHP, I want to increment the date by one month, and I want the year to be automatically incremented, if necessary (i.e. incrementing from December 2012 to January 2013).
Regards.
$time = strtotime("2010.12.11");
$final = date("Y-m-d", strtotime("+1 month", $time));
// Finally you will have the date you're looking for.
I needed similar functionality, except for a monthly cycle (plus months, minus 1 day). After searching S.O. for a while, I was able to craft this plug-n-play solution:
function add_months($months, DateTime $dateObject)
{
$next = new DateTime($dateObject->format('Y-m-d'));
$next->modify('last day of +'.$months.' month');
if($dateObject->format('d') > $next->format('d')) {
return $dateObject->diff($next);
} else {
return new DateInterval('P'.$months.'M');
}
}
function endCycle($d1, $months)
{
$date = new DateTime($d1);
// call second function to add the months
$newDate = $date->add(add_months($months, $date));
// goes back 1 day from date, remove if you want same day of month
$newDate->sub(new DateInterval('P1D'));
//formats final date to Y-m-d form
$dateReturned = $newDate->format('Y-m-d');
return $dateReturned;
}
Example:
$startDate = '2014-06-03'; // select date in Y-m-d format
$nMonths = 1; // choose how many months you want to move ahead
$final = endCycle($startDate, $nMonths); // output: 2014-07-02
Use DateTime::add.
$start = new DateTime("2010-12-11", new DateTimeZone("UTC"));
$month_later = clone $start;
$month_later->add(new DateInterval("P1M"));
I used clone because add modifies the original object, which might not be desired.
strtotime( "+1 month", strtotime( $time ) );
this returns a timestamp that can be used with the date function
You can use DateTime::modify like this :
$date = new DateTime('2010-12-11');
$date->modify('+1 month');
See documentations :
https://php.net/manual/en/datetime.modify.php
https://php.net/manual/en/class.datetime.php
UPDATE january 2021 : correct mistakes raised by comments
This solution has some problems for months with 31 days like May etc.
Exemple : this jumps from 31st May to 1st July which is incorrect.
To correct that, you can create this custom function
function addMonths($date,$months){
$init=clone $date;
$modifier=$months.' months';
$back_modifier =-$months.' months';
$date->modify($modifier);
$back_to_init= clone $date;
$back_to_init->modify($back_modifier);
while($init->format('m')!=$back_to_init->format('m')){
$date->modify('-1 day') ;
$back_to_init= clone $date;
$back_to_init->modify($back_modifier);
}
}
Then you can use it like that :
$date = new DateTime('2010-05-31');
addMonths($date, 1);
print_r($date);
//DateTime Object ( [date] => 2010-06-30 00:00:00.000000 [timezone_type] => 3 [timezone] => Europe/Berlin )
This solution was found in PHP.net posted by jenspj : https://www.php.net/manual/fr/datetime.modify.php#107592
(date('d') > 28) ? date("mdY", strtotime("last day of next month")) : date("mdY", strtotime("+1 month"));
This will compensate for February and the other 31 day months. You could of course do a lot more checking to to get more exact for 'this day next month' relative date formats (which does not work sadly, see below), and you could just as well use DateTime.
Both DateInterval('P1M') and strtotime("+1 month") are essentially blindly adding 31 days regardless of the number of days in the following month.
2010-01-31 => March 3rd
2012-01-31 => March 2nd (leap year)
Please first you set your date format as like 12-12-2012
After use this function it's work properly;
$date = date('d-m-Y',strtotime("12-12-2012 +2 Months");
Here 12-12-2012 is your date and +2 Months is increment of the month;
You also increment of Year, Date
strtotime("12-12-2012 +1 Year");
Ans is 12-12-2013
I use this way:-
$occDate='2014-01-28';
$forOdNextMonth= date('m', strtotime("+1 month", strtotime($occDate)));
//Output:- $forOdNextMonth=02
/*****************more example****************/
$occDate='2014-12-28';
$forOdNextMonth= date('m', strtotime("+1 month", strtotime($occDate)));
//Output:- $forOdNextMonth=01
//***********************wrong way**********************************//
$forOdNextMonth= date('m', strtotime("+1 month", $occDate));
//Output:- $forOdNextMonth=02; //instead of $forOdNextMonth=01;
//******************************************************************//
Just updating the answer with simple method for find the date after no of months. As the best answer marked doesn't give the correct solution.
<?php
$date = date('2020-05-31');
$current = date("m",strtotime($date));
$next = date("m",strtotime($date."+1 month"));
if($current==$next-1){
$needed = date('Y-m-d',strtotime($date." +1 month"));
}else{
$needed = date('Y-m-d', strtotime("last day of next month",strtotime($date)));
}
echo "Date after 1 month from 2020-05-31 would be : $needed";
?>
If you want to get the date of one month from now you can do it like this
echo date('Y-m-d', strtotime('1 month'));
If you want to get the date of two months from now, you can achieve that by doing this
echo date('Y-m-d', strtotime('2 month'));
And so on, that's all.
Thanks Jason, your post was very helpful. I reformatted it and added more comments to help me understand it all. In case that helps anyone, I have posted it here:
function cycle_end_date($cycle_start_date, $months) {
$cycle_start_date_object = new DateTime($cycle_start_date);
//Find the date interval that we will need to add to the start date
$date_interval = find_date_interval($months, $cycle_start_date_object);
//Add this date interval to the current date (the DateTime class handles remaining complexity like year-ends)
$cycle_end_date_object = $cycle_start_date_object->add($date_interval);
//Subtract (sub) 1 day from date
$cycle_end_date_object->sub(new DateInterval('P1D'));
//Format final date to Y-m-d
$cycle_end_date = $cycle_end_date_object->format('Y-m-d');
return $cycle_end_date;
}
//Find the date interval we need to add to start date to get end date
function find_date_interval($n_months, DateTime $cycle_start_date_object) {
//Create new datetime object identical to inputted one
$date_of_last_day_next_month = new DateTime($cycle_start_date_object->format('Y-m-d'));
//And modify it so it is the date of the last day of the next month
$date_of_last_day_next_month->modify('last day of +'.$n_months.' month');
//If the day of inputted date (e.g. 31) is greater than last day of next month (e.g. 28)
if($cycle_start_date_object->format('d') > $date_of_last_day_next_month->format('d')) {
//Return a DateInterval object equal to the number of days difference
return $cycle_start_date_object->diff($date_of_last_day_next_month);
//Otherwise the date is easy and we can just add a month to it
} else {
//Return a DateInterval object equal to a period (P) of 1 month (M)
return new DateInterval('P'.$n_months.'M');
}
}
$cycle_start_date = '2014-01-31'; // select date in Y-m-d format
$n_months = 1; // choose how many months you want to move ahead
$cycle_end_date = cycle_end_date($cycle_start_date, $n_months); // output: 2014-07-02
function dayOfWeek($date){
return DateTime::createFromFormat('Y-m-d', $date)->format('N');
}
Usage examples:
echo dayOfWeek(2016-12-22);
// "4"
echo dayOfWeek(date('Y-m-d'));
// "4"
$date = strtotime("2017-12-11");
$newDate = date("Y-m-d", strtotime("+1 month", $date));
If you want to increment by days you can also do it
$date = strtotime("2017-12-11");
$newDate = date("Y-m-d", strtotime("+5 day", $date));
For anyone looking for an answer to any date format.
echo date_create_from_format('d/m/Y', '15/04/2017')->add(new DateInterval('P1M'))->format('d/m/Y');
Just change the date format.
//ECHO MONTHS BETWEEN TWO TIMESTAMPS
$my_earliest_timestamp = 1532095200;
$my_latest_timestamp = 1554991200;
echo '<pre>';
echo "Earliest timestamp: ". date('c',$my_earliest_timestamp) ."\r\n";
echo "Latest timestamp: " .date('c',$my_latest_timestamp) ."\r\n\r\n";
echo "Month start of earliest timestamp: ". date('c',strtotime('first day of '. date('F Y',$my_earliest_timestamp))) ."\r\n";
echo "Month start of latest timestamp: " .date('c',strtotime('first day of '. date('F Y',$my_latest_timestamp))) ."\r\n\r\n";
echo "Month end of earliest timestamp: ". date('c',strtotime('last day of '. date('F Y',$my_earliest_timestamp)) + 86399) ."\r\n";
echo "Month end of latest timestamp: " .date('c',strtotime('last day of '. date('F Y',$my_latest_timestamp)) + 86399) ."\r\n\r\n";
$sMonth = strtotime('first day of '. date('F Y',$my_earliest_timestamp));
$eMonth = strtotime('last day of '. date('F Y',$my_earliest_timestamp)) + 86399;
$xMonth = strtotime('+1 month', strtotime('first day of '. date('F Y',$my_latest_timestamp)));
while ($eMonth < $xMonth) {
echo "Things from ". date('Y-m-d',$sMonth) ." to ". date('Y-m-d',$eMonth) ."\r\n\r\n";
$sMonth = $eMonth + 1; //add 1 second to bring forward last date into first second of next month.
$eMonth = strtotime('last day of '. date('F Y',$sMonth)) + 86399;
}
I find the mtkime() function works really well for this:
$start_date="2021-10-01";
$start_date_plus_a_month=date("Y-m-d", mktime(0, 0, 0, date("m",strtotime($start_date))+1, date("d",strtotime($start_date)), date("Y",strtotime($start_date))));
result: 2021-11-01
I like to subtract 1 from the 'day' to produce '2021-10-31' which can be useful if you want to display a range across 12 months, e.g. Oct 1, 2021 to Sep 30 2022
$start_date_plus_a_year=date("Y-m-d", mktime(0, 0, 0, date("m",strtotime($start_date))+12, date("d",strtotime($start_date))-1, date("Y",strtotime($start_date))));
result: 2022-09-30
The correct answer to the exact question asked is Giuseppe Canale's answer from earlier. I'm going to answer a slightly more generic question of how to increment the date by an arbitrary number of months, however.
<?php
/**
* Will return a timestamp corresponding to first day of the month that is N months into the future.
* #param int $months_later number of months into the future: 0 for current one
* #param string $today if supplied will be used as the "now" time
* #return int
*/
function rel_month_to_time($months_later, $today=null) {
if ($months_later===0) {
return is_null($today) ? time() : strtotime($today);
}
return strtotime('first day of next month', rel_month_to_time($months_later-1, $today));
}
As is many times the case, you can use recursion for these "human problems" like calendars. The above can be used to return a timestamp corresponding to "next month" -- the way we humans think of it.
<?php echo date('Y-m-d', rel_month_to_time(1, '2023-01-30'));
// 2023-02-01
As pointed by #NetVicious i corrected the code, it should work with all dates, some example:
2013-01-30 will be 2013-02-28
2013-05-15 will be 2013-05-15
2013-05-31 will be 2013-06-30
This code uses the DateTime class to create a new date object, then it adds 1 month to the date using the modify method. Next, it gets the day of the next month using the format method. If the next month's day doesn't match the original day, it modifies the date to the last day of the previous month using the modify method.
$original_date = "2013-01-30";
$original_day = date("d", strtotime($original_date));
$date = new DateTime($original_date);
$date->modify('+1 month');
$next_month_day = $date->format('d');
if ($next_month_day != $original_day) {
$date->modify('last day of previous month');
}
$new_date = $date->format('Y-m-d');
echo $new_date;
All presented solutions are not working properly.
strtotime() and DateTime::add or DateTime::modify give sometime invalid results.
Examples:
- 31.08.2019 + 1 month gives 01.10.2019 instead 30.09.2019
- 29.02.2020 + 1 year gives 01.03.2021 instead 28.02.2021
(tested on PHP 5.5, PHP 7.3)
Below is my function based on idea posted by Angelo that solves the problem:
// $time - unix time or date in any format accepted by strtotime() e.g. 2020-02-29
// $days, $months, $years - values to add
// returns new date in format 2021-02-28
function addTime($time, $days, $months, $years)
{
// Convert unix time to date format
if (is_numeric($time))
$time = date('Y-m-d', $time);
try
{
$date_time = new DateTime($time);
}
catch (Exception $e)
{
echo $e->getMessage();
exit;
}
if ($days)
$date_time->add(new DateInterval('P'.$days.'D'));
// Preserve day number
if ($months or $years)
$old_day = $date_time->format('d');
if ($months)
$date_time->add(new DateInterval('P'.$months.'M'));
if ($years)
$date_time->add(new DateInterval('P'.$years.'Y'));
// Patch for adding months or years
if ($months or $years)
{
$new_day = $date_time->format("d");
// The day is changed - set the last day of the previous month
if ($old_day != $new_day)
$date_time->sub(new DateInterval('P'.$new_day.'D'));
}
// You can chage returned format here
return $date_time->format('Y-m-d');
}
Usage examples:
echo addTime('2020-02-29', 0, 0, 1); // add 1 year (result: 2021-02-28)
echo addTime('2019-08-31', 0, 1, 0); // add 1 month (result: 2019-09-30)
echo addTime('2019-03-15', 12, 2, 1); // add 12 days, 2 months, 1 year (result: 2019-09-30)
put a date in input box then click the button get day from date in jquery
$(document).ready( function() {
$("button").click(function(){
var day = ["Sunday","Monday","Tuesday","Wednesday","Thursday","Friday","Saturday"];
var a = new Date();
$(".result").text(day[a.getDay()]);
});
});
<?php
$selectdata ="select fromd,tod from register where username='$username'";
$q=mysqli_query($conm,$selectdata);
$row=mysqli_fetch_array($q);
$startdate=$row['fromd'];
$stdate=date('Y', strtotime($startdate));
$endate=$row['tod'];
$enddate=date('Y', strtotime($endate));
$years = range ($stdate,$enddate);
echo '<select name="years" class="form-control">';
echo '<option>SELECT</option>';
foreach($years as $year)
{ echo '<option value="'.$year.'"> '.$year.' </option>'; }
echo '</select>'; ?>