Date counter based on current date - php

I need to generate an html code of a list of 10 open days following the current day, by open days I mean business days (m,t,w,t and f), I'm using the following function to translate the date to french:
function f_date() {
$temps = time();
$jours = array('Dimanche', 'Lundi', 'Mardi', 'Mercredi', 'Jeudi', 'Vendredi', 'Samedi');
$jours_numero = date('w', $temps);
$jours_complet = $jours[$jours_numero];
$NumeroDuJour = date('d', $temps);
$mois = array(' ', 'Janvier', 'Février', 'Mars', 'Avril', 'Mai', 'Juin', 'Juillet', 'Août', 'Septembre', 'Octobre', 'Novembre', 'Décembre');
$mois_numero = date("n", $temps);
$mois_complet = $mois[$mois_numero];
$an = date('Y', $temps);
$fr_temps = "$jours_complet, $NumeroDuJour $mois_complet $an";
return "$fr_temps";
}
echo "<br/>".f_date();
And i want to generate the following result:
<select name="ladate">
<option selected="selected" value="Mardi, 29 mai 2012">29 mai 2012</option>
<option value="Mercredi, 30 mai 2012">30 mai 2012</option></select>
....
<option value="Vendredi, 15 juin 2012">15 juin 2012</option></select>
</select>
Please tell me if you need further information.
Thank you.

Since you are only looking for MTWTF and you want the next 10 days, you can always safely look for the next 14 days and ignore the weekends and that will give 10 days. It won't work for holidays or anything like that but you can change it if you need to do that. I'll give you the pseudo-code here, I'll leave all the array mapping and text output to you
for ($days_to_add : 1 to 14) {
$new_date = date_add($days_to_add);
// check the day of the week
if (date('N', $new_date) >= 6) {
// ignore it, it's a weekend
continue;
}
// output the option tag for $new_date
echo "<option ... </option>"
}
This relies on the 10 and 14 day assumption, if you wanted to change that number you could add some sort of counter and only increment the counter if you were looking at a weekday/non-holiday

Just create a loop, increase the days up to ten and ignore all non open days (Sat, Sun). date('N') is your friend to detect the weekday of a given date.
<?php
$i = $openDay = 0;
while($openDay < 10) {
$i++;
$time = strtotime('+'.$i.' days');
$day = date('N', $time);
if ($day == 6 or $day == 7) { // ignore Saturdays and Sundays
continue;
}
echo f_date($time).'<br>';
$openDay++;
}
You also have to modify your date_f() function to use $temps as parameter.
<?php
function f_date($temps = null) {
// $temps = time();
// ...
}

Related

Omitting redundant months and years in date range list

I have got strange issue with dates of events and I have tried hard to get it fixed but unable to do it.
I am attaching a screenshot of how I want to display the dates on the page :
In the picture the first event Deine Energie in Aktion! is a combination of 5 events with each event having its start date and end date.
The first part of the event is 1 day event which starts on 4th April and ends on 4th April. Similarly the second part is on 7th April, 3rd part on 9th April and 4th part on 20th April
The last part starts on 5th May and ends on 10th May.
The dates are stored in database in this format :
I am showing the dates for last part of event.
Event Start Date : 2013-05-05 00:00:00
Event End Date : 2013-05-10 00:00:00
So I want to display dates in the format shown in the picture.
There are multiple cases:
First is if all the dates are coming within a single month then we display the month name at the end only once.
Second is if months are changed then the month name will be shown after the date when the month is changed.
I am getting events dates in a while loop, so how do I compare the current event date with the coming event date in a loop.
This is the code I have used so far to get the dates from the database..
$nid = $row->nid;
$get_product_id = "SELECT product_id from {uc_product_kits} where nid='$nid'";
$res = db_query($get_product_id);
while ($get_product_id_array_value = db_fetch_array($res)) {
$prductid = $get_product_id_array_value['product_id'];
$start_date = db_query("select event_start,event_end from {event} where nid=%d",$prductid);
$start_date_value = db_fetch_object($start_date);
$end_value = $start_date_value->event_start;
$event_end_date = $start_date_value->event_end;
$TotalStart = date("d M Y", strtotime($end_value));
$TotalEnd = date("d M Y", strtotime($event_end_date));
$onlyMonthStart = date("M", strtotime($end_value));
$onlyMonthEnd = date("M", strtotime($event_end_date));
//$groupMonth = db_query("select event_start,event_end, month from {event} where nid=%d group by ",$prductid);
if($TotalStart == $TotalEnd ){
$startDay = date("d", strtotime($end_value));
$startMonth = date("M", strtotime($end_value));
if(in_array($startMonth,$newMonth)) {
echo $onlstartdate;
}
else {
$onlstartdate = date("d", strtotime($end_value));
echo $onlstartdate;
$tempStorage[] = $startMonth
}
//$newMonth[] = $startMonth;
}
}
Easiest would be to first collect all data from your query into e.g. array.
Only then iterate over the array. Having all data together will allow you to compare two consecutive date ranges to decide level of details you need to print for each.
Commented example:
// collect data from SQL query into structure like this:
$events = array(
array("event_start" => "2013-4-4", "event_end" => "2013-4-4"),
array("event_start" => "2013-4-7", "event_end" => "2013-4-7"),
array("event_start" => "2013-4-9", "event_end" => "2013-4-9"),
array("event_start" => "2013-4-20", "event_end" => "2013-4-20"),
array("event_start" => "2013-5-5", "event_end" => "2013-5-10"),
array("event_start" => "2014-1-1", "event_end" => "2014-1-2"),
);
// the actual code for range list generation:
for ($i = 0; $i < count($events); $i++)
{
// parse start and end of this range
$this_event = $events[$i];
$this_start_date = strtotime($this_event["event_start"]);
$this_end_date = strtotime($this_event["event_end"]);
// extract months and years
$this_start_month = date("M", $this_start_date);
$this_end_month = date("M", $this_end_date);
$this_start_year = date("Y", $this_start_date);
$this_end_year = date("Y", $this_end_date);
$last = ($i == count($events) - 1);
// parse start and end of next range, if any
if (!$last)
{
$next_event = $events[$i + 1];
$next_start_date = strtotime($next_event["event_start"]);
$next_end_date = strtotime($next_event["event_end"]);
$next_start_month = date("M", $next_start_date);
$next_end_month = date("M", $next_end_date);
$next_start_year = date("Y", $next_start_date);
$next_end_year = date("Y", $next_end_date);
}
// ranges with different starting and ending months always go
// on their own line
if (($this_start_month != $this_end_month) ||
($this_start_year != $this_end_year))
{
echo date("j M", $this_start_date);
// print starting year only if it differs from ending year
if ($this_start_year != $this_end_year)
{
echo " ".date("Y", $this_start_date);
}
echo "-".date("j M Y", $this_end_year)." <br/>\n";
}
else
{
// this is range starting and ending in the same month
echo date("j", $this_start_date);
// different starting and ending day
if ($this_start_date != $this_end_date)
{
echo "-".date("j", $this_end_date);
}
$newline = false;
// print month for the last range;
// and for any range that starts(=ends) in different month
// than the next range ends
if ($last ||
($this_start_month != $next_end_month))
{
echo " ".date("M", $this_start_date);
$newline = true;
}
// print year for the last range;
// and for any range that starts(=ends) in different year
// than next range ends
if ($last ||
($this_start_year != $next_end_year) ||
($next_start_month != $next_end_month))
{
echo " ".date("Y", $this_start_date);
$newline = true;
}
if ($newline)
{
echo " <br/>\n";
}
else
{
// month (and year) will be printed for some future range
// on the same line
echo ", ";
}
}
}
This outputs:
4, 7, 9, 20 Apr <br/>
5-10 May 2013 <br/>
1-2 Jan 2014 <br/>
A possibility to check if you need to print the month for the current date item is actually to check in the next item. Let me try to explain with pseudocode:
<?php
$month = 0; // Initialize $month variable to unset
// Loop over all your events
foreach($dates as $date) {
// Convert $date to a timestamp
// If the 'month' of the current $timestamp is unequal to $month
// it means we switch months and we have to print the $month first
if(date('m', $timestamp) != $month) {
echo $month; // Of course format how you want it to be displayed
// Set $month to the new month
$month = date('m', $timestamp);
}
// Print the rest of the event, like day numbers here
}
?>
Well, since you need to compare value from one loop to another, you won't be able to use echo directly.
You need to use temp variables. So with the first loop for the start date, you store $tmp_day_1 and $tmp_month_1 then with the end date loop you can compare both months and check if they are diferents. Then you can use echo. I hope I make my point :)

PHP. How to get a bimonthly recurring event?

I'm trying many approaches but then I get stuck half way.
Let's say order was created today. I need to display when the next recurring order will happen. So I have order created June 13, 2012. Then I have set the schedule to bimonthly recurring order, every 1st of month. How to calculate when the next recurring order will happen? The answer is August 1st.
If someone can outline an approach it would be very useful, it doesn't have to be code. This is what I have so far...
// first, get starting date
$start_date_month = date('m', strtotime($start_date));
// get this year
$this_year = date('Y');
// if this month is december, next month is january
$this_month = date('m', $timestamp_month);
if($this_month == 12){
$next_month = 1;
// if this month is not december add 1 to get next month
}else{
$next_month = $this_month + 1;
}
// get array of months where recurring orders will happen
$months = array();
for ($i=1; $i<=6; $i++) {
$add_month = $start_date_month+(2*$i); // 2, 4, 6, 8, 10, 12
if($add_month == 13){$add_month = 1;$year = $this_year+1;}
elseif($add_month == 14){$add_month = 2;$year = $this_year+1;}
elseif($add_month == 15){$add_month = 3;$year = $this_year+1;}
elseif($add_month == 16){$add_month = 4;$year = $this_year+1;}
elseif($add_month == 17){$add_month = 5;$year = $this_year+1;}
elseif($add_month == 18){$add_month = 6;$year = $this_year+1;}
elseif($add_month == 19){$add_month = 7;$year = $this_year+1;}
elseif($add_month == 20){$add_month = 8;$year = $this_year+1;}
else{$year = $this_year;}
echo $what_day.'-'.$add_month.'-'.$year.'<br />';
$months[] = $add_month;
}
echo '<pre>';
print_r($months);
echo '</pre>';
I don't want to simply find what's the date in two months from now. Let's say order created June 1. Next recurring order is August 1. Then let's say now, today is September 1st, but next recurring order is October 1st. See my dilemma?
Just take the current month, so since it's June, we get 6. 6 mod 2 == 0. Next month is July, we get 7. 7 mod 2 == 1.
So just check if current month % 2 == (first month % 2).
Then just check if it's the 1st of the month.
In PHP modulus is defined with the percentage symbol.
$month = date('n');
$createdMonth = 6;
if($month % 2 == $createdMonth % 2){
// stuff
}
You might find the library called When useful for this (I'm the author).
Here is code which will get you the next 2 recurring monthly dates (from todays date):
include 'When.php';
$r = new When();
$r->recur(new DateTime(), 'monthly')
->count(2)
->interval(2) // every other month
->bymonthday(array(1));
while($result = $r->next())
{
echo $result->format('c') . '<br />';
}
// output
// 2012-08-01T13:33:33-04:00
// 2012-10-01T13:33:33-04:00
Taking this a step further, you likely only want to find the 2 first business days:
include 'When.php';
$r = new When();
$r->recur(new DateTime(), 'monthly')
->count(2)
->interval(2) // every other month
->byday(array('MO', 'TU', 'WE', 'TH', 'FR')) // week days only
->bymonthday(array(1, 2, 3)) // the first weekday will fall on one of these days
->bysetpos(array(1)); // only return one per month
while($result = $r->next())
{
echo $result->format('c') . '<br />';
}
// output
// 2012-08-01T13:33:33-04:00
// 2012-10-01T13:33:33-04:00
Also note, the code is currently under a rewrite -- it works well but it is a little confusing and not well documented.
strtotime to the rescue:
<?php
date_default_timezone_set('Europe/London');
$d = new DateTime('2012-01-31');
$d->modify('first day of +2 months');
echo $d->format('r'), "\n";
?>
Let's say you want the next six orders:
$order_date = '6/13/2012';
$start = date('Y-m-01', strtotime($order_date));
$order_count = 6;
$future_orders = array();
$next = strtotime('+2 months', strtotime($start));
while(count($future_orders) < $order_count){
$future_orders[] = date('m/d/Y',$next);
$next = strtotime('+2 months', $next);
}
This can, obviously, be improved upon, but it should get you started ...
I got this:
$today = new DateTime();
$target_date = $today->modify("first day of +2 months");
echo "Your event is on " . $target_date->format("d/m/Y") . "!";

Get week number (in the year) from a date PHP

I want to take a date and work out its week number.
So far, I have the following. It is returning 24 when it should be 42.
<?php
$ddate = "2012-10-18";
$duedt = explode("-",$ddate);
$date = mktime(0, 0, 0, $duedt[2], $duedt[1],$duedt[0]);
$week = (int)date('W', $date);
echo "Weeknummer: ".$week;
?>
Is it wrong and a coincidence that the digits are reversed? Or am I nearly there?
Today, using PHP's DateTime objects is better:
<?php
$ddate = "2012-10-18";
$date = new DateTime($ddate);
$week = $date->format("W");
echo "Weeknummer: $week";
It's because in mktime(), it goes like this:
mktime(hour, minute, second, month, day, year);
Hence, your order is wrong.
<?php
$ddate = "2012-10-18";
$duedt = explode("-", $ddate);
$date = mktime(0, 0, 0, $duedt[1], $duedt[2], $duedt[0]);
$week = (int)date('W', $date);
echo "Weeknummer: " . $week;
?>
$date_string = "2012-10-18";
echo "Weeknummer: " . date("W", strtotime($date_string));
Use PHP's date function
http://php.net/manual/en/function.date.php
date("W", $yourdate)
This get today date then tell the week number for the week
<?php
$date=date("W");
echo $date." Week Number";
?>
Just as a suggestion:
<?php echo date("W", strtotime("2012-10-18")); ?>
Might be a little simpler than all that lot.
Other things you could do:
<?php echo date("Weeknumber: W", strtotime("2012-10-18 01:00:00")); ?>
<?php echo date("Weeknumber: W", strtotime($MY_DATE)); ?>
Becomes more difficult when you need year and week.
Try to find out which week is 01.01.2017.
(It is the 52nd week of 2016, which is from Mon 26.12.2016 - Sun 01.01.2017).
After a longer search I found
strftime('%G-%V',strtotime("2017-01-01"))
Result: 2016-52
https://www.php.net/manual/de/function.strftime.php
ISO-8601:1988 week number of the given year, starting with the first week of the year with at least 4 weekdays, with Monday being the start of the week. (01 through 53)
The equivalent in mysql is DATE_FORMAT(date, '%x-%v')
https://www.w3schools.com/sql/func_mysql_date_format.asp
Week where Monday is the first day of the week (01 to 53).
Could not find a corresponding solution with DateTime.
At least not without solutions like "+1day, last monday".
Edit: since strftime is now deprecated, maybe you can also use date.
Didn't verify it though.
date('o-W',strtotime("2017-01-01"));
I have tried to solve this question for years now, I thought I found a shorter solution but had to come back again to the long story. This function gives back the right ISO week notation:
/**
* calcweek("2018-12-31") => 1901
* This function calculates the production weeknumber according to the start on
* monday and with at least 4 days in the new year. Given that the $date has
* the following format Y-m-d then the outcome is and integer.
*
* #author M.S.B. Bachus
*
* #param date-notation PHP "Y-m-d" showing the data as yyyy-mm-dd
* #return integer
**/
function calcweek($date) {
// 1. Convert input to $year, $month, $day
$dateset = strtotime($date);
$year = date("Y", $dateset);
$month = date("m", $dateset);
$day = date("d", $dateset);
$referenceday = getdate(mktime(0,0,0, $month, $day, $year));
$jan1day = getdate(mktime(0,0,0,1,1,$referenceday[year]));
// 2. check if $year is a leapyear
if ( ($year%4==0 && $year%100!=0) || $year%400==0) {
$leapyear = true;
} else {
$leapyear = false;
}
// 3. check if $year-1 is a leapyear
if ( (($year-1)%4==0 && ($year-1)%100!=0) || ($year-1)%400==0 ) {
$leapyearprev = true;
} else {
$leapyearprev = false;
}
// 4. find the dayofyearnumber for y m d
$mnth = array(0, 31, 59, 90, 120, 151, 181, 212, 243, 273, 304, 334);
$dayofyearnumber = $day + $mnth[$month-1];
if ( $leapyear && $month > 2 ) { $dayofyearnumber++; }
// 5. find the jan1weekday for y (monday=1, sunday=7)
$yy = ($year-1)%100;
$c = ($year-1) - $yy;
$g = $yy + intval($yy/4);
$jan1weekday = 1+((((intval($c/100)%4)*5)+$g)%7);
// 6. find the weekday for y m d
$h = $dayofyearnumber + ($jan1weekday-1);
$weekday = 1+(($h-1)%7);
// 7. find if y m d falls in yearnumber y-1, weeknumber 52 or 53
$foundweeknum = false;
if ( $dayofyearnumber <= (8-$jan1weekday) && $jan1weekday > 4 ) {
$yearnumber = $year - 1;
if ( $jan1weekday = 5 || ( $jan1weekday = 6 && $leapyearprev )) {
$weeknumber = 53;
} else {
$weeknumber = 52;
}
$foundweeknum = true;
} else {
$yearnumber = $year;
}
// 8. find if y m d falls in yearnumber y+1, weeknumber 1
if ( $yearnumber == $year && !$foundweeknum) {
if ( $leapyear ) {
$i = 366;
} else {
$i = 365;
}
if ( ($i - $dayofyearnumber) < (4 - $weekday) ) {
$yearnumber = $year + 1;
$weeknumber = 1;
$foundweeknum = true;
}
}
// 9. find if y m d falls in yearnumber y, weeknumber 1 through 53
if ( $yearnumber == $year && !$foundweeknum ) {
$j = $dayofyearnumber + (7 - $weekday) + ($jan1weekday - 1);
$weeknumber = intval( $j/7 );
if ( $jan1weekday > 4 ) { $weeknumber--; }
}
// 10. output iso week number (YYWW)
return ($yearnumber-2000)*100+$weeknumber;
}
I found out that my short solution missed the 2018-12-31 as it gave back 1801 instead of 1901. So I had to put in this long version which is correct.
How about using the IntlGregorianCalendar class?
Requirements: Before you start to use IntlGregorianCalendar make sure that libicu or pecl/intl is installed on the Server.
So run on the CLI:
php -m
If you see intl in the [PHP Modules] list, then you can use IntlGregorianCalendar.
DateTime vs IntlGregorianCalendar:
IntlGregorianCalendar is not better then DateTime. But the good thing about IntlGregorianCalendar is that it will give you the week number as an int.
Example:
$dateTime = new DateTime('21-09-2020 09:00:00');
echo $dateTime->format("W"); // string '39'
$intlCalendar = IntlCalendar::fromDateTime ('21-09-2020 09:00:00');
echo $intlCalendar->get(IntlCalendar::FIELD_WEEK_OF_YEAR); // integer 39
<?php
$ddate = "2012-10-18";
$duedt = explode("-",$ddate);
$date = mktime(0, 0, 0, $duedt[1], $duedt[2],$duedt[0]);
$week = (int)date('W', $date);
echo "Weeknummer: ".$week;
?>
You had the params to mktime wrong - needs to be Month/Day/Year, not Day/Month/Year
To get the week number for a date in North America I do like this:
function week_number($n)
{
$w = date('w', $n);
return 1 + date('z', $n + (6 - $w) * 24 * 3600) / 7;
}
$n = strtotime('2022-12-27');
printf("%s: %d\n", date('D Y-m-d', $n), week_number($n));
and get:
Tue 2022-12-27: 53
for get week number in jalai calendar you can use this:
$weeknumber = date("W"); //number week in year
$dayweek = date("w"); //number day in week
if ($dayweek == "6")
{
$weeknumberint = (int)$weeknumber;
$date2int++;
$weeknumber = (string)$date2int;
}
echo $date2;
result:
15
week number change in saturday
The most of the above given examples create a problem when a year has 53 weeks (like 2020). So every fourth year you will experience a week difference. This code does not:
$thisYear = "2020";
$thisDate = "2020-04-24"; //or any other custom date
$weeknr = date("W", strtotime($thisDate)); //when you want the weeknumber of a specific week, or just enter the weeknumber yourself
$tempDatum = new DateTime();
$tempDatum->setISODate($thisYear, $weeknr);
$tempDatum_start = $tempDatum->format('Y-m-d');
$tempDatum->setISODate($thisYear, $weeknr, 7);
$tempDatum_end = $tempDatum->format('Y-m-d');
echo $tempDatum_start //will output the date of monday
echo $tempDatum_end // will output the date of sunday
Very simple
Just one line:
<?php $date=date("W"); echo "Week " . $date; ?>"
You can also, for example like I needed for a graph, subtract to get the previous week like:
<?php $date=date("W"); echo "Week " . ($date - 1); ?>
Your code will work but you need to flip the 4th and the 5th argument.
I would do it this way
$date_string = "2012-10-18";
$date_int = strtotime($date_string);
$date_date = date($date_int);
$week_number = date('W', $date_date);
echo "Weeknumber: {$week_number}.";
Also, your variable names will be confusing to you after a week of not looking at that code, you should consider reading http://net.tutsplus.com/tutorials/php/why-youre-a-bad-php-programmer/
The rule is that the first week of a year is the week that contains the first Thursday of the year.
I personally use Zend_Date for this kind of calculation and to get the week for today is this simple. They have a lot of other useful functions if you work with dates.
$now = Zend_Date::now();
$week = $now->get(Zend_Date::WEEK);
// 10
To get Correct Week Count for Date 2018-12-31 Please use below Code
$day_count = date('N',strtotime('2018-12-31'));
$week_count = date('W',strtotime('2018-12-31'));
if($week_count=='01' && date('m',strtotime('2018-12-31'))==12){
$yr_count = date('y',strtotime('2018-12-31')) + 1;
}else{
$yr_count = date('y',strtotime('2018-12-31'));
}
function last_monday($date)
{
if (!is_numeric($date))
$date = strtotime($date);
if (date('w', $date) == 1)
return $date;
else
return date('Y-m-d',strtotime('last monday',$date));
}
$date = '2021-01-04'; //Enter custom date
$year = date('Y',strtotime($date));
$date1 = new DateTime($date);
$ldate = last_monday($year."-01-01");
$date2 = new DateTime($ldate);
$diff = $date2->diff($date1)->format("%a");
$diff = $diff/7;
$week = intval($diff) + 1;
echo $week;
//Returns 2.
try this solution
date( 'W', strtotime( "2017-01-01 + 1 day" ) );

Calculate week of a month [duplicate]

So I have a script that returns the number of weeks in a particular month and year. How can I take a specific day from that month and determine if it is part of week 1,2,3,4 or 5 of that month?
The most frustrating thing I have ever tried to get working - but here it is!
<?php
/**
* Returns the amount of weeks into the month a date is
* #param $date a YYYY-MM-DD formatted date
* #param $rollover The day on which the week rolls over
*/
function getWeeks($date, $rollover)
{
$cut = substr($date, 0, 8);
$daylen = 86400;
$timestamp = strtotime($date);
$first = strtotime($cut . "00");
$elapsed = ($timestamp - $first) / $daylen;
$weeks = 1;
for ($i = 1; $i <= $elapsed; $i++)
{
$dayfind = $cut . (strlen($i) < 2 ? '0' . $i : $i);
$daytimestamp = strtotime($dayfind);
$day = strtolower(date("l", $daytimestamp));
if($day == strtolower($rollover)) $weeks ++;
}
return $weeks;
}
//
echo getWeeks("2011-06-11", "sunday"); //outputs 2, for the second week of the month
?>
Edit: so much for "single line" - needed variables to avoid recomputation with the conditional. Tossed in a default argument while I was at it.
function weekOfMonth($when = null) {
if ($when === null) $when = time();
$week = date('W', $when); // note that ISO weeks start on Monday
$firstWeekOfMonth = date('W', strtotime(date('Y-m-01', $when)));
return 1 + ($week < $firstWeekOfMonth ? $week : $week - $firstWeekOfMonth);
}
Please note that weekOfMonth(strtotime('Oct 31, 2011')); will return 6; some rare months have 6 weeks in them, contrary to OP's expectation. January 2017 is another month with 6 ISO weeks - Sunday the 1st falls in the last year's week, since ISO weeks start on Monday.
For starshine531, to return a 0 indexed week of the month, change the return 1 + to return 0 + or return (int).
For Justin Stayton, for weeks starting on Sunday instead of Monday I would use strftime('%U' instead of date('W', as follows:
function weekOfMonth($when = null) {
if ($when === null) $when = time();
$week = strftime('%U', $when); // weeks start on Sunday
$firstWeekOfMonth = strftime('%U', strtotime(date('Y-m-01', $when)));
return 1 + ($week < $firstWeekOfMonth ? $week : $week - $firstWeekOfMonth);
}
For this version, 2017-04-30 is now in week 6 of April, while 2017-01-31 is now in week 5.
public function getWeeks($timestamp)
{
$maxday = date("t",$timestamp);
$thismonth = getdate($timestamp);
$timeStamp = mktime(0,0,0,$thismonth['mon'],1,$thismonth['year']); //Create time stamp of the first day from the give date.
$startday = date('w',$timeStamp); //get first day of the given month
$day = $thismonth['mday'];
$weeks = 0;
$week_num = 0;
for ($i=0; $i<($maxday+$startday); $i++) {
if(($i % 7) == 0){
$weeks++;
}
if($day == ($i - $startday + 1)){
$week_num = $weeks;
}
}
return $week_num;
}
Hello all i have been struggling for the whole day trying to figure this code out, i finally figured it out so i thought i would share it with you all.
all you need to do is put a time stamp into the function and it will return the week number back to you.
thanks
there is a problem with this method. if the passing date (Lets say 2012/01/01 which is a Sunday) and "$rollover" day is "Sunday", then this function will return 2. where its actually is 1'st week. i think i have fixed it in following function.
please add comments to make it better.
function getWeeks($date, $rollover)
{
$cut = substr($date, 0, 8);
$daylen = 86400;
$timestamp = strtotime($date);
$first = strtotime($cut . "01");
$elapsed = (($timestamp - $first) / $daylen)+1;
$i = 1;
$weeks = 0;
for($i==1; $i<=$elapsed; $i++)
{
$dayfind = $cut . (strlen($i) < 2 ? '0' . $i : $i);
$daytimestamp = strtotime($dayfind);
$day = strtolower(date("l", $daytimestamp));
if($day == strtolower($rollover))
{
$weeks++;
}
}
if($weeks==0)
{
$weeks++;
}
return $weeks;
}
This is a solution based on sberry's mathematical solution but using the PHP DateTime class instead.
function week_of_month($date) {
$first_of_month = new DateObject($date->format('Y/m/1'));
$day_of_first = $first_of_month->format('N');
$day_of_month = $date->format('j');
return floor(($day_of_first + $day_of_month - 1) / 7) + 1;
}
Just Copy and Past the code and pass month and year.
e.g month=04 year=2013.
That's exactly what You Need.
$mm= $_REQUEST['month'];
$yy= $_REQUEST['year'];
$startdate=date($yy."-".$mm."-01") ;
$current_date=date('Y-m-t');
$ld= cal_days_in_month(CAL_GREGORIAN, $mm, $yy);
$lastday=$yy.'-'.$mm.'-'.$ld;
$start_date = date('Y-m-d', strtotime($startdate));
$end_date = date('Y-m-d', strtotime($lastday));
$end_date1 = date('Y-m-d', strtotime($lastday." + 6 days"));
$count_week=0;
$week_array = array();
for($date = $start_date; $date <= $end_date1; $date = date('Y-m-d', strtotime($date. ' + 7 days')))
{
$getarray=getWeekDates($date, $start_date, $end_date);
echo "<br>";
$week_array[]=$getarray;
echo "\n";
$count_week++;
}
// its give the number of week for the given month and year
echo $count_week;
//print_r($week_array);
function getWeekDates($date, $start_date, $end_date)
{
$week = date('W', strtotime($date));
$year = date('Y', strtotime($date));
$from = date("Y-m-d", strtotime("{$year}-W{$week}+1"));
if($from < $start_date) $from = $start_date;
$to = date("Y-m-d", strtotime("{$year}-W{$week}-6"));
if($to > $end_date) $to = $end_date;
$array1 = array(
"ssdate" => $from,
"eedate" => $to,
);
return $array1;
// echo "Start Date-->".$from."End Date -->".$to;
}
for($i=0;$i<$count_week;$i++)
{
$start= $week_array[$i]['ssdate'];
echo "--";
$week_array[$i]['eedate'];
echo "<br>";
}
OUTPUT:
week( 0 )=>2013-03-01---2013-03-02
week( 1 )=>2013-03-03---2013-03-09
week( 2 )=>2013-03-10---2013-03-16
week( 3 )=>2013-03-17---2013-03-23
week( 4 )=>2013-03-24---2013-03-30
week( 5 )=>2013-03-31---2013-03-31
I think I found an elegant solution
$time = time(); // or whenever
$week_of_the_month = ceil(date('d', $time)/7);
For a Monday-Sunday (ISO 8601) week (or, if you simply don't care), you can do this in one line:
function get_week_of_month($date) {
return date('W', $date) - date('W', strtotime(date("Y-m-01", $date))) + 1;
}
(Source)
For anything else, (e.g. a Sunday-Saturday week), you just need to tweak $date inside the function:
function get_week_of_month($date) {
$date += 86400; //For weeks starting on Sunday
return date('W', $date) - date('W', strtotime(date("Y-m-01", $date))) + 1;
}
(Thanks to these guys/gals)
NOTE: You may run into some issues at the end of the year (e.g. around 12/31, 1/1, etc.). Read more here.
This is the snippet that I made to fulfill my requirements for the same. Hope this will help you.
function getWeek($timestamp) {
$week_year = date('W',$timestamp);
$week = 0;//date('d',$timestamp)/7;
$year = date('Y',$timestamp);
$month = date('m',$timestamp);
$day = date('d',$timestamp);
$prev_month = date('m',$timestamp) -1;
if($month != 1 ){
$last_day_prev = $year."-".$prev_month."-1";
$last_day_prev = date('t',strtotime($last_day_prev));
$week_year_last_mon = date('W',strtotime($year."-".$prev_month."-".$last_day_prev));
$week_year_first_this = date('W',strtotime($year."-".$month."-1"));
if($week_year_first_this == $week_year_last_mon){
$week_diff = 0;
}
else{
$week_diff = 1;
}
if($week_year ==1 && $month == 12 ){
// to handle December's last two days coming in first week of January
$week_year = 53;
}
$week = $week_year-$week_year_last_mon + 1 +$week_diff;
}
else{
// to handle first three days January coming in last week of December.
$week_year_first_this = date('W',strtotime($year."-01-1"));
if($week_year_first_this ==52 || $week_year_first_this ==53){
if($week_year == 52 || $week_year == 53){
$week =1;
}
else{
$week = $week_year + 1;
}
}
else{
$week = $week_year;
}
}
return $week;
}
This is probably not a good way to do this but it's my first thought and I'm really tired.
Put all your dates into an array. The date object must have a day name (Monday). Create a method that searches the array and when ever you hit a Sunday you add 1 to a week counter. Once you find the date you're looking for return the week counter. That is the week the day falls in of the year. For the week in the month you have to reset the week counter every time you get to the last day in each month.
Here comes two liner:
function getWeekOfMonth(DateTime $date) {
$firstDayOfMonth = new DateTime($date->format('Y-m-1'));
return ceil(($firstDayOfMonth->format('N') + $date->format('j') - 1) / 7);
}
And Wtower's solutions doesn't work 100% properly.
Thought I'd share my function as well. This returns an array of weeks. Every week is an array with weeks day (0..6) as key and months day (1..31) as value.
Function assumes that week starts with Sunday.
Enjoy!
function get_weeks($year, $month){
$days_in_month = date("t", mktime(0, 0, 0, $month, 1, $year));
$weeks_in_month = 1;
$weeks = array();
//loop through month
for ($day=1; $day<=$days_in_month; $day++) {
$week_day = date("w", mktime(0, 0, 0, $month, $day, $year));//0..6 starting sunday
$weeks[$weeks_in_month][$week_day] = $day;
if ($week_day == 6) {
$weeks_in_month++;
}
}
return $weeks;
}
My 5 cents:
/**
* calculate number of weeks in a particular month
*/
function weeksInMonth($month=null,$year=null){
if( null==($year) ) {
$year = date("Y",time());
}
if(null==($month)) {
$month = date("m",time());
}
// find number of days in this month
$daysInMonths = date('t',strtotime($year.'-'.$month.'-01'));
$numOfweeks = ($daysInMonths%7==0?0:1) + intval($daysInMonths/7);
$monthEndingDay= date('N',strtotime($year.'-'.$month.'-'.$daysInMonths));
$monthStartDay = date('N',strtotime($year.'-'.$month.'-01'));
if($monthEndingDay<$monthStartDay){
$numOfweeks++;
}
return $numOfweeks;
}
I create this function, from brazil :) I hope it is useful
function weekofmonth($time) {
$firstday = 1;
$lastday = date('j',$time);
$lastdayweek = 6; //Saturday
$week = 1;
for ($day=1;$day<=$lastday;$day++) {
$timetmp = mktime(0, 0, 0, date('n',$time), $day, date('Y',$time));
if (date('N',$timetmp) == $lastdayweek) {
$week++;
}
}
if (date('N',$time)==$lastdayweek) {
$week--;
}
return $week;
}
$time = mktime(0, 0, 0, 9, 30, 2014);
echo weekofmonth($time);
I found a easy way to determine what week of the month today is in, and it would be a small change to have it work on any other date. I'm adding my two cents in here as I think my way is much more compact then the methods listed.
$monthstart = date("N",strtotime(date("n/1/Y")));
$date =( date("j")+$monthstart ) /7;
$ddate= floor( $date );
if($ddate != date) {$ddate++;}
and $ddate contains the week number you could modify it like so
function findweek($indate)
{
$monthstart = date("N",strtotime(date("n/1/Y",strtotime($indate))));
$date =( date("j",strtotime($indate))+$monthstart ) /7;
$ddate= floor( $date );
if($ddate != $date) {$ddate++;}
return $ddate;
}
and it would return what week of the month any date you give it is.
what it does is first find the number of days from the start of the week to the first of the month. then adds that on to the current date then divides the new date by 7 and that will give you how many weeks have passed since the start of the month, including a decimal place for the part of the the current week that has passed. so what I do next is round down that number, then compare the rounded down version to the original if the two match your at the end of the week so it's already in the number. if they don't then just add one to the rounded down number and voila you have the current week number.
Srahul07's solution works perfectly... If you abide by the Monday-Sunday week system! Here in 'murica, non-business folk tend to go by Sunday-Saturday being a week, so May 1, 2011 is week 1 and May 2, 2011 is still week 1.
Adding the following logic to the bottom of his function, right before it returns $week will convert this to a Sunday -> Monday system:
if (!date('w',strtotime("$year-$month-01")) && date('w',$timestamp))
$week--;
elseif (date('w',strtotime("$year-$month-01")) && !date('w',$timestamp))
$week++;
After alot of efoort i found the solution
<?php
function getWeeks($month,$year)
{
$month = intval($month); //force month to single integer if '0x'
$suff = array('st','nd','rd','th','th','th'); //week suffixes
$end = date('t',mktime(0,0,0,$month,1,$year)); //last date day of month: 28 - 31
$start = date('w',mktime(0,0,0,$month,1,$year)); //1st day of month: 0 - 6 (Sun - Sat)
$last = 7 - $start; //get last day date (Sat) of first week
$noweeks = ceil((($end - ($last + 1))/7) + 1); //total no. weeks in month
$output = ""; //initialize string
$monthlabel = str_pad($month, 2, '0', STR_PAD_LEFT);
for($x=1;$x<$noweeks+1;$x++)
{
if($x == 1)
{
$startdate = "$year-$monthlabel-01";
$day = $last - 6;
}
else
{
$day = $last + 1 + (($x-2)*7);
$day = str_pad($day, 2, '0', STR_PAD_LEFT);
$startdate = "$year-$monthlabel-$day";
}
if($x == $noweeks)
{
$enddate = "$year-$monthlabel-$end";
}
else
{
$dayend = $day + 6;
$dayend = str_pad($dayend, 2, '0', STR_PAD_LEFT);
$enddate = "$year-$monthlabel-$dayend";
}
$j=1;
if($j--)
{
$k=getTotalDate($startdate,$enddate);
$j=1;
}
$output .= "Week ".$xyz." week -> Start date=$startdate End date=$enddate <br />";
}
return $output;
}
if(isset($_POST) && !empty($_POST)){
$month = $_POST['m'];
$year = $_POST['y'];
echo getWeeks($month,$year);
}
?>
<form method="post">
M:
<input name="m" value="" />
Y:
<input name="y" value="" />
<input type="submit" value="go" />
</form>
I really liked #michaelc's answer. However, I got stuck on a few points. It seemed that every time Sunday rolled around, there was an offset of one. I think it has to do with what day of the week is the start of the week. In any case, here is my slight alteration to it, expanded a bit for readability:
function wom(\DateTime $date) {
// The week of the year of the current month
$cw = date('W', $date->getTimestamp());
// The week of the year of the first of the given month
$fw = date('W',strtotime(date('Y-m-01',$date->getTimeStamp())));
// Offset
$o = 1;
// If it is a Saturday, offset by two.
if( date('N',$date->getTimestamp()) == 7 ) {
$o = 2;
}
return $cw -$fw + $o;
}
So if the date is Nov. 9, 2013...
$cw = 45
$fw = 44
and with the offset of 1, it correctly returns 2.
If the date is Nov. 10, 2013, $cw and $fw are the same as before, but the offset is 2, and it correctly returns 3.
function get_week_of_month( $timestamp )
{
$week_of_month = 0;
$month = date( 'j', $timestamp );
$test_month = $month;
while( $test_month == $month )
{
$week_of_month++;
$timestamp = strtotime( '-1 week', $timestamp );
$test_month = date( 'j', $timestamp );
}
return $week_of_month;
}
I found this online:
http://kcwebprogrammers.blogspot.de/2009/03/current-week-in-month-php.html
He has a very simple solution which seems to work fine for me.
$currentWeek = ceiling((date("d") - date("w") - 1) / 7) + 1;
So for example:
$now = strtotime("today");
$weekOfMonth = ceil((date("d", $now) - date("w", $now) - 1) / 7) + 1;
you can use W in newer php versions. http://php.net/manual/en/function.date.php
i have used it like so:
function getWeek($date) {
$month_start=strtotime("1 ".date('F Y',$date));
$current_date=strtotime(date('j F Y',$date));
$month_week=date("W",$month_start);
$current_week=date("W",$current_date);
return ($current_week-$month_week);
}//0 is the week of the first.
Short and foolproof:
// Function accepts $date as a string,
// Returns the week number in which the given date falls.
// Assumed week starts on Sunday.
function wom($date) {
$date = strtotime($date);
$weeknoofday = date('w', $date);
$day = date('j', $date);
$weekofmonth = ceil(($day + (7-($weeknoofday+1))) / 7);
return $weekofmonth;
}
// Test
foreach (range(1, 31) as $day) {
$test_date = "2015-01-" . str_pad($day, 2, '0', STR_PAD_LEFT);
echo "$test_date - ";
echo wom($test_date) . "\n";
}
I use this simple function:
function weekNumberInMonth($timestampDate)
{
$firstDayOfMonth = strtotime(date('01-M-Y 00:00:00', $timestampDate));
$firstWeekdayOfMonth = date( 'w', $firstDayOfMonth);
$dayNumberInMonth = date('d', $timestampDate);
$weekNumberInMonth = ceil(($dayNumberInMonth + $firstWeekdayOfMonth) / 7);
return $weekNumberInMonth;
}
if I understand correct, the question is how to identify what number of week within a month of a specific day... I was looking for similar solution. I used some ideas of above answers to develop my own solution. Hope it can be helpful for somebody. If Yes, then UpVote my answer.
function week_number_within_month($datenew){
$year = date("Y",strtotime($datenew));
$month = date("m",strtotime($datenew));
// find number of days in this month
$daysInMonths = date('t',strtotime($year.'-'.$month.'-01'));
$numOfweeks = ($daysInMonths%7==0?0:1) + intval($daysInMonths/7);
$monthEndingDay= date('N',strtotime($year.'-'.$month.'-'.$daysInMonths));
$monthStartDay = date('N',strtotime($year.'-'.$month.'-01'));
if($monthEndingDay<$monthStartDay){
$numOfweeks++;
}
$date=date('Y/m/d', strtotime($year.'-'. $month.'-01'));
$week_array=Array();
for ($i=1; $i<=$numOfweeks; $i++){ /// create an Array of all days of month separated by weeks as a keys
$max = 7;
if ($i ==1){ $max = 8 - $monthStartDay;}
if ($i == $numOfweeks){ $max = $monthEndingDay;}
for ($r=1; $r<=$max; $r++){
$week_array[$i][]=$date;
$date = date('Y/m/d',strtotime($date . "+1 days"));
}
}
$new_datenew = date('Y/m/d', strtotime($datenew));
$week_result='';
foreach ($week_array as $key => $val){ /// finding what week number of my date from week_array
foreach ($val as $kr => $value){
if ($new_datenew == $value){
$week_result = $key;
}
}
}
return $week_result;
}
print week_number_within_month('2016-09-15');
function getWeekOfMonth(\DateTime $date)
{
$firstWeekdayOfMonth = new DateTime("first weekday 0 {$date->format('M')} {$date->format('Y')}");
$offset = $firstWeekdayOfMonth->format('N')-1;
return intval(($date->format('j') + $offset)/7)+1;
}
/**
* In case of Week we can get the week of year. So whenever we will get the week of the month then we have to
* subtract the until last month weeks from it will give us the current month week.
*/
$dateComponents = getdate();
if($dateComponents['mon'] == 1)
$weekOfMonth = date('W', strtotime($dateComponents['year'].'-'.$dateComponents['mon'].'-'.$dateComponents['mday']))-1; // We subtract -1 to map it to the array
else
$weekOfMonth = date('W', strtotime($dateComponents['year'].'-'.$dateComponents['mon'].'-'.$dateComponents['mday']))-date('W', strtotime($dateComponents['year'].'-'.$dateComponents['mon'].'-01'));
Using Carbon:
$date = Carbon::now();
$d1 = $date->startOfMonth();
$d2 = $date->endOfMonth();
$weeks = $d1->diffInWeeks($d2);
If you clearly want to separate a month into 4 Weeks, you can use this function.
This is helpful, if you want
"the first monday of month"
"the third thursday of month" etc.
Here we go
/**
* This Calculates (and returns) the week number within a month, based on date('j') day of month.
* This is useful, if you want to have (for instance) the first Thu in month, regardless of date
* #param $Timestamp
* #return float|int
*/
function getWeekOfMonth($Timestamp)
{
$DayOfMonth=date('j', $Timestamp); // Day of the month without leading zeros 0-31
if($DayOfMonth>21) return 4;
if($DayOfMonth>14) return 3;
if($DayOfMonth>7) return 2;
return 1;
}
From carbon:
return (int) ceil((new Datetime())->format('d') / 7);
As simple as possible :)
Python: Number of the Week in a Month
This is a worked example in Python - should be simple to convert.

Next business day of given date in PHP

Does anyone have a PHP snippet to calculate the next business day for a given date?
How does, for example, YYYY-MM-DD need to be converted to find out the next business day?
Example:
For 03.04.2011 (DD-MM-YYYY) the next business day is 04.04.2011.
For 08.04.2011 the next business day is 11.04.2011.
This is the variable containing the date I need to know the next business day for
$cubeTime['time'];
Variable contains: 2011-04-01
result of the snippet should be: 2011-04-04
Next Weekday
This finds the next weekday from a specific date (not including Saturday or Sunday):
echo date('Y-m-d', strtotime('2011-04-05 +1 Weekday'));
You could also do it with a date variable of course:
$myDate = '2011-04-05';
echo date('Y-m-d', strtotime($myDate . ' +1 Weekday'));
UPDATE: Or, if you have access to PHP's DateTime class (very likely):
$date = new DateTime('2018-01-27');
$date->modify('+7 weekday');
echo $date->format('Y-m-d');
Want to Skip Holidays?:
Although the original poster mentioned "I don't need to consider holidays", if you DO happen to want to ignore holidays, just remember - "Holidays" is just an array of whatever dates you don't want to include and differs by country, region, company, person...etc.
Simply put the above code into a function that excludes/loops past the dates you don't want included. Something like this:
$tmpDate = '2015-06-22';
$holidays = ['2015-07-04', '2015-10-31', '2015-12-25'];
$i = 1;
$nextBusinessDay = date('Y-m-d', strtotime($tmpDate . ' +' . $i . ' Weekday'));
while (in_array($nextBusinessDay, $holidays)) {
$i++;
$nextBusinessDay = date('Y-m-d', strtotime($tmpDate . ' +' . $i . ' Weekday'));
}
I'm sure the above code can be simplified or shortened if you want. I tried to write it in an easy-to-understand way.
For UK holidays you can use
https://www.gov.uk/bank-holidays#england-and-wales
The ICS format data is easy to parse. My suggestion is...
# $date must be in YYYY-MM-DD format
# You can pass in either an array of holidays in YYYYMMDD format
# OR a URL for a .ics file containing holidays
# this defaults to the UK government holiday data for England and Wales
function addBusinessDays($date,$numDays=1,$holidays='') {
if ($holidays==='') $holidays = 'https://www.gov.uk/bank-holidays/england-and-wales.ics';
if (!is_array($holidays)) {
$ch = curl_init($holidays);
curl_setopt($ch,CURLOPT_RETURNTRANSFER,true);
$ics = curl_exec($ch);
curl_close($ch);
$ics = explode("\n",$ics);
$ics = preg_grep('/^DTSTART;/',$ics);
$holidays = preg_replace('/^DTSTART;VALUE=DATE:(\\d{4})(\\d{2})(\\d{2}).*/s','$1-$2-$3',$ics);
}
$addDay = 0;
while ($numDays--) {
while (true) {
$addDay++;
$newDate = date('Y-m-d', strtotime("$date +$addDay Days"));
$newDayOfWeek = date('w', strtotime($newDate));
if ( $newDayOfWeek>0 && $newDayOfWeek<6 && !in_array($newDate,$holidays)) break;
}
}
return $newDate;
}
function next_business_day($date) {
$add_day = 0;
do {
$add_day++;
$new_date = date('Y-m-d', strtotime("$date +$add_day Days"));
$new_day_of_week = date('w', strtotime($new_date));
} while($new_day_of_week == 6 || $new_day_of_week == 0);
return $new_date;
}
This function should ignore weekends (6 = Saturday and 0 = Sunday).
This function will calculate the business day in the future or past. Arguments are number of days, forward (1) or backwards(0), and a date. If no date is supplied todays date will be used:
// returned $date Y/m/d
function work_days_from_date($days, $forward, $date=NULL)
{
if(!$date)
{
$date = date('Y-m-d'); // if no date given, use todays date
}
while ($days != 0)
{
$forward == 1 ? $day = strtotime($date.' +1 day') : $day = strtotime($date.' -1 day');
$date = date('Y-m-d',$day);
if( date('N', strtotime($date)) <= 5) // if it's a weekday
{
$days--;
}
}
return $date;
}
What you need to do is:
Convert the provided date into a timestamp.
Use this along with the or w or N formatters for PHP's date command to tell you what day of the week it is.
If it isn't a "business day", you can then increment the timestamp by a day (86400 seconds) and check again until you hit a business day.
N.B.: For this is really work, you'd also need to exclude any bank or public holidays, etc.
I stumbled apon this thread when I was working on a Danish website where I needed to code a "Next day delivery" PHP script.
Here is what I came up with (This will display the name of the next working day in Danish, and the next working + 1 if current time is more than a given limit)
$day["Mon"] = "Mandag";
$day["Tue"] = "Tirsdag";
$day["Wed"] = "Onsdag";
$day["Thu"] = "Torsdag";
$day["Fri"] = "Fredag";
$day["Sat"] = "Lørdag";
$day["Sun"] = "Søndag";
date_default_timezone_set('Europe/Copenhagen');
$date = date('l');
$checkTime = '1400';
$date2 = date(strtotime($date.' +1 Weekday'));
if( date( 'Hi' ) >= $checkTime) {
$date2 = date(strtotime($date.' +2 Weekday'));
}
if (date('l') == 'Saturday'){
$date2 = date(strtotime($date.' +2 Weekday'));
}
if (date('l') == 'Sunday') {
$date2 = date(strtotime($date.' +2 Weekday'));
}
echo '<p>Næste levering: <span>'.$day[date("D", $date2)].'</span></p>';
As you can see in the sample code $checkTime is where I set the time limit which determines if the next day delivery will be +1 working day or +2 working days.
'1400' = 14:00 hours
I know that the if statements can be made more compressed, but I show my code for people to easily understand the way it works.
I hope someone out there can use this little snippet.
Here is the best way to get business days (Mon-Fri) in PHP.
function days()
{
$week=array();
$weekday=["Monday","Tuesday","Wednesday","Thursday","Friday"];
foreach ($weekday as $key => $value)
{
$sort=$value." this week";
$day=date('D', strtotime($sort));
$date=date('d', strtotime($sort));
$year=date('Y-m-d', strtotime($sort));
$weeks['day']= $day;
$weeks['date']= $date;
$weeks['year']= $year;
$week[]=$weeks;
}
return $week;
}
Hope this will help you guys.
Thanks,.
See the example below:
$startDate = new DateTime( '2013-04-01' ); //intialize start date
$endDate = new DateTime( '2013-04-30' ); //initialize end date
$holiday = array('2013-04-11','2013-04-25'); //this is assumed list of holiday
$interval = new DateInterval('P1D'); // set the interval as 1 day
$daterange = new DatePeriod($startDate, $interval ,$endDate);
foreach($daterange as $date){
if($date->format("N") <6 AND !in_array($date->format("Y-m-d"),$holiday))
$result[] = $date->format("Y-m-d");
}
echo "<pre>";print_r($result);
For more info: http://goo.gl/YOsfPX
You could do something like this.
/**
* #param string $date
* #param DateTimeZone|null|null $DateTimeZone
* #return \NavigableDate\NavigableDateInterface
*/
function getNextBusinessDay(string $date, ? DateTimeZone $DateTimeZone = null):\NavigableDate\NavigableDateInterface
{
$Date = \NavigableDate\NavigableDateFacade::create($date, $DateTimeZone);
$NextDay = $Date->nextDay();
while(true)
{
$nextDayIndexInTheWeek = (int) $NextDay->format('N');
// check if the day is between Monday and Friday. In DateTime class php, Monday is 1 and Friday is 5
if ($nextDayIndexInTheWeek >= 1 && $nextDayIndexInTheWeek <= 5)
{
break;
}
$NextDay = $NextDay->nextDay();
}
return $NextDay;
}
$date = '2017-02-24';
$NextBussinessDay = getNextBusinessDay($date);
var_dump($NextBussinessDay->format('Y-m-d'));
Output:
string(10) "2017-02-27"
\NavigableDate\NavigableDateFacade::create($date, $DateTimeZone), is provided by php library available at https://packagist.org/packages/ishworkh/navigable-date. You need to first include this library in your project with composer or direct download.
I used below methods in PHP, strtotime() does not work specially in leap year February month.
public static function nextWorkingDay($date, $addDays = 1)
{
if (strlen(trim($date)) <= 10) {
$date = trim($date)." 09:00:00";
}
$date = new DateTime($date);
//Add days
$date->add(new DateInterval('P'.$addDays.'D'));
while ($date->format('N') >= 5)
{
$date->add(new DateInterval('P1D'));
}
return $date->format('Y-m-d H:i:s');
}
This solution for 5 working days (you can change if you required for 6 or 4 days working). if you want to exclude more days like holidays then just check another condition in while loop.
//
while ($date->format('N') >= 5 && !in_array($date->format('Y-m-d'), self::holidayArray()))

Categories