Related
I have project built using laravel and a I have to build a function that counts all the complete quarters that are in the selected date range - the dates used are inserted via input.
Here are the quarters(i used numerical representations for the months)
01 - 03 first quarter
04 - 06 second quarter
07 - 09 third quarter
10 - 12 forth quarter
I would really appreciate your help,because I've been at it for an entire day now and basically have nothing to show for it,i thing I've been trying so hard i'm actually at the point where i'm so tired, i can t think straight.
I do have some code but it;s worthless, because it doesn't work, and any kind of idea or snippet of code is welcomed.
Thanks for your help in advance.
I managed to do this using multiple functions; basically, if this is needed for chart statistics, then a more specific approach might be the case.
I have done this in Laravel with timestamp dates as input (this code can be adapted for getting semesters also :) , it works and is already tested):
public static function getQuartersBetween($start_ts, $end_ts)
{
$quarters = [];
$months_per_year = [];
$years = self::getYearsBetween($start_ts, $end_ts);
$months = self::getMonthsBetween($start_ts, $end_ts);
foreach ($years as $year) {
foreach ($months as $month) {
if ($year->format('Y') == $month->format('Y')) {
$months_per_year[$year->format('Y')][] = $month;
}
}
}
foreach ($months_per_year as $year => $months) {
$january = new Date('01-01-' . $year);
$march = new Date('01-03-' . $year);
$april = new Date('01-04-' . $year);
$june = new Date('01-06-' . $year);
$july = new Date('01-07-' . $year);
$september = new Date('01-09-' . $year);
$october = new Date('01-10-' . $year);
$december = new Date('01-12-' . $year);
if (in_array($january, $months) && in_array($march, $months)) {
$quarter_per_year['label'] = 'T1 / ' . $year;
$quarter_per_year['start_day'] = $january->startOfMonth();
$quarter_per_year['end_day'] = $march->endOfMonth()->endOfDay();
array_push($quarters, $quarter_per_year);
}
if (in_array($april, $months) && in_array($june, $months)) {
$quarter_per_year['label'] = 'T2 / ' . $year;
$quarter_per_year['start_day'] = $april->startOfMonth();
$quarter_per_year['end_day'] = $june->endOfMonth()->endOfDay();
array_push($quarters, $quarter_per_year);
}
if (in_array($july, $months) && in_array($september, $months)) {
$quarter_per_year['label'] = 'T3 / ' . $year;
$quarter_per_year['start_day'] = $july->startOfMonth();
$quarter_per_year['end_day'] = $september->endOfMonth()->endOfDay();
array_push($quarters, $quarter_per_year);
}
if (in_array($october, $months) && in_array($december, $months)) {
$quarter_per_year['label'] = 'T4 / ' . $year;
$quarter_per_year['start_day'] = $october->startOfMonth();
$quarter_per_year['end_day'] = $december->endOfMonth()->endOfDay();
array_push($quarters, $quarter_per_year);
}
}
return $quarters;
}
and getting the years between:
public static function getYearsBetween($start_ts, $end_ts, $full_period = false)
{
$return_data = [];
$current = mktime(0, 0, 0, date('m', $start_ts), date('d', $start_ts), date('Y', $start_ts));
while ($current < $end_ts) {
$temp_date = $current;
$year = new Date($temp_date);
$return_data[] = $year;
$current = strtotime("+1 year", $current); // add a year
}
if ($full_period) {
$return_data[] = $end_ts;
}
return $return_data;
}
, also getting the months needed
public static function getMonthsBetween($start_ts, $end_ts, $full_period = false)
{
$return_data = $month_list = [];
$current = mktime(0, 0, 0, date('m', $start_ts), date('d', $start_ts), date('Y', $start_ts));
while ($current <= $end_ts) {
$temp_date = $current;
$date = new Date($temp_date);
$month_list[] = $date;
$current = strtotime("+1 month", $current); // add a month
}
$start_date_last_month = new Date(array_first($month_list));
$start_date_last_month = $start_date_last_month->startOfMonth()->format('m-d');
$temp_end_date = new Date($start_ts);
$temp_end_date = $temp_end_date->format('m-d');
if ($start_date_last_month < $temp_end_date) {
array_shift($month_list);
}
$end_date_last_month = new Date(end($month_list));
$current_day_month = $end_date_last_month->endOfMonth()->format('m-d');
$temp_end_date = new Date($end_ts);
$end_day_of_month = $temp_end_date->format('m-d');
if ($end_day_of_month < $current_day_month) {
array_pop($month_list);
}
if (count($month_list) == 0) {
$month_list[] = $end_date_last_month->subMonth();
}
$return_data = $month_list;
if ($full_period) {
$return_data[] = $end_ts;
}
return $return_data;
}
You can do something like in this example:
$February = 2;
$October = 10;
$completedQuarters = ceil($October/3) - ceil($February/3); // = 3
What about the quarter in which the date range starts, should it also count? If it should only count if it begins in the first month of a quarter you can check for it like this:
$completedQuarters = ceil($October/3) - ceil($February/3) -1; // = 2
if($February-1%3 == 0) $completedQuarters += 1;
You´re description is not very clear, let me know if that´s what you had in mind.
Not sure if the following is what you are meaning but might be useful
$date_start='2015/03/12';
$date_end='2017/11/14';
$timezone=new DateTimeZone('Europe/London');
$start=new DateTime( $date_start, $timezone );
$end=new DateTime( $date_end, $timezone );
$difference = $end->diff( $start );
$months = ( ( $difference->format('%y') * 12 ) + $difference->format('%m') );
$quarters = intval( $months / 3 );
printf( 'Quarters between %s and %s is %d covering %d months', $start->format('l, jS F Y'), $end->format('l, jS F Y'), $quarters, $months );
/*
This will output
----------------
Quarters between Thursday, 12th March 2015 and Tuesday, 14th November 2017 is 10 covering 32 months
*/
Something like this in the function and you should be set.
use Carbon\Carbon;
$first = Carbon::parse('2012-1-1'); //first param
$second = Carbon::parse('2014-9-15'); //second param
$fY = $first->year; //2012
$fQ = $first->quarter; //1
$sY = $second->year; //2014
$sQ = $second->quarter; //3
$n = 0; //the number of quarters we have counted
$i = 0; //an iterator we will use to determine if we are in the first year
for ($y=$fY; $y < $sY; $y++, $i++) { //for each year less than the second year (if any)
$s = ($i > 0) ? 1 : $fQ; //determine the starting quarter
for ($q=$s; $q <= 4; $q++) { //for each quarter
$n++; //count it
}
}
if ($sY > $fY) { //if both dates are not in the same year
$n = $n + $sQ; //total is the number of quarters we've counted plus the second quarter value
} else {
for ($q=$fQ; $q <= $sQ; $q++) { //for each quarter between the first quarter and second
$n++; //count it
}
}
print $n; //the value to return (11)
I have this code that modify date in the way I want, for example, if starting date is 31/01/2000, adding 1 month will return 29/02/2000, then, 31/03/2000.
If date is 30/01/2000 (not last day of the month) it will return 29/02/2000, then 30/03/2000, 30/04/2000 and so on.
I want to transfirm that code in a general case function, to be able to add 1,3,6,12 months, and inside the for loop, to work all corect.
I would like it to be a function 2 or 3 arguments, startingDate, duration(nr of iterations), frequency (add 1/3/6/12 months per once).
<?php
$date = new DateTime('2000-01-28'); // or whatever
#echo $date->format('d')." ".$date->format('t');
$expectedDay = $date->format('d');
$month = $date->format('m');
$year = $date->format('Y');
for ($i = 0; $i < 100; $i++) {
echo $date->format('Y-m-d') . "<br>";
if ($month++ == 12) {
$year++;
$month = 1;
}
$date->modify("${year}-${month}-1");
if ($expectedDay > $date->format('t')) {
$day = $date->format('t');
} else {
$day = $expectedDay;
}
$date->modify("${year}-${month}-${day}");
}
Whelp, there's an extremely easy function for this in PHP nowadays.
first, you get a timestamp instead of a datetime:
$timestamp = $date->getTimestamp();
Now, just use strtotime to add onto the date.
strtotime("+1 month", $myTimestamp);
You can change the +1 into anything you want, so you just throw the amount in the string and voila; a dynamic way of adding them!
however, since you want to do +30 days instead of a natural month, you're better off just adding 30 days to the timestamp, like so:
$timestamp = $timestamp + (3600 * 24 * 30); //s per h * h per d * d
So, you'd end up with something like this:
function calculateTime($startingDate, $iterations, $frequency){
$timeStamp = strtotime($startingDate);//if you expect a string date
$timeToAdd = (3600 * 24 * 30) * $frequency; //30 days * frequency
$return = array();
$return[] = date('Y-m-d', $timeStamp); //Original date
$previousDate = $timeStamp; //Original date for now
for($i = 0; $i < $iterations; $i++){
$newDate = $previousDate + (3600 * 24 * 30);
$return[] = date('Y-m-d', $newDate);
$previousDate = $newDate;
}
return $return;
}
And then for the rendering part:
//Let's render this stuff
$dates = calculateTime('24-08-2017', 25, 3);
foreach($dates as $date){
echo "$date</br>";
}
If you'd like to do it with full months, something like this:
<?php
function calculateTime($startingDate, $iterations, $frequency){
$timeStamp = strtotime($startingDate);//if you expect a string date
$return = array();
$return[] = date('Y-m-d', $timeStamp); //Original date
$previousDate = $timeStamp; //Original date for now
for($i = 0; $i < $iterations; $i++){
$lastDay = false;
//It's the last day of the month
if(date('t', $timeStamp) == date('d', $timeStamp)){
$lastDay = true;
}
if($frequency == 12){
$newDate = strtotime('+1 year', $previousDate);
}
else{
if($lastDay){
$firstDayOfMonth = strtotime(date("01-m-Y", $previousDate));
$newDate =strtotime("+$frequency month", $firstDayOfMonth);
}
else{
$newDate = strtotime("+$frequency month", $previousDate);
}
}
if($lastDay){
$return[] = date('Y-m-t', $newDate);
}
else{
$return[] = date('Y-m-d', $newDate);
}
$previousDate = $newDate;
}
return $return;
}
//Let's render this stuff
$dates = calculateTime('31-01-2000', 25, 1);
foreach($dates as $date){
echo "$date</br>";
}
I hope this helps? :)
If you'd like to see how this works quickly, just paste my code into a phpfiddle. Unfortunately the save function is broken right now.
I have a period with startdate of 2016-12-26 and end date 2017-03-04.
Now I would like to find out how many days in each months there is, from a given period. Expected output from the above period dates (array):
2016-12: 5
2017-01: 31
2017-02: 28
2017-03: 4
How can I accomplish this cleanest way? I have tried to:
first looking at the period_start, get the days = 26 and
find out the start/end dates of the months between 2016-12 and 2017-03, to then calculate the days here (31 respectively 28 in february)
then finally calculating the 4 days in 2017-03.
But is there any cleaner/better way?
This can be achieved easily using the DateTime class. Create the objects, and use DateTime::diff() on them, then use the days property.
$start = new DateTime("2016-12-26");
$end = new DateTime("2017-03-04");
echo $start->diff($end)->days; // Output: 68
Live demo
http://php.net/datetime.construct
#Karem hope this logic will help you, this is working case for all your conditions please try this below one:
<?php
$startDate = '2016-12-26';
$endDate = '2017-03-04';
$varDate = $startDate;
while($varDate < $endDate){
$d = date('d', strtotime($varDate));
$Y = date('Y', strtotime($varDate));
$m = date('m', strtotime($varDate));
$days = cal_days_in_month(CAL_GREGORIAN,$m,$Y);
$time = strtotime($varDate);
if($varDate == $startDate){
$time = strtotime(date('Y-m-01', $time));
$days = $days - $d;
}
else if(date("Y-m", strtotime($varDate)) == date("Y-m", strtotime($endDate))){
$days = date("j", strtotime($endDate));
}
echo date('Y-m', strtotime($varDate)). ": ".$days."<br>";
$varDate = date('Y-m-d', strtotime("+1 month", $time));
}
This is long but easy to understand that how to achieve you your goal
<?php
function getMonthDays($start,$end){
if($start < $end){
$start_time = strtotime($start);
$last_day_of_start = strtotime(date("Y-m-t",$start_time));
$start_month_days = ($last_day_of_start - $start_time)/(60*60*24);
echo date("Y-m",$start_time).": ".$start_month_days."\n";
$days = "";
$start = date("Y-m-d", strtotime("+1 month", $start_time));
$start_time = strtotime($start);
while($start < $end){
$month = date("m",$start_time);
$year = date("Y",$start_time);
$days = date('t', mktime(0, 0, 0, $month, 1, $year));
echo date("Y-m",$start_time).": ".$days."\n";
$start = date("Y-m-d", strtotime("+1 month", $start_time));
$start_time = strtotime($start);
}
echo date("Y-m",strtotime($end)).": ".date("d",strtotime($end))."\n";
}else{
echo "Wrong Input";
}
}
getMonthDays('2016-12-26','2017-03-04');
?>
live demo : https://eval.in/781724
Function returns array : https://eval.in/781741
<?php
$d1 = strtotime('2016-12-26');
$d2 = strtotime('2017-03-04');
echo floor(($d2 - $d1)/(60*60*24));
?>
i used Carbon (https://carbon.nesbot.com/docs/) but you can do it with any other time lib.
$startDate = Carbon::createFromFormat('!Y-m-d', '2017-01-11');;
$endDate = Carbon::createFromFormat('!Y-m-d', '2018-11-13');;
$diffInMonths = $endDate->diffInMonths($startDate);
for ($i = 0; $i <= $diffInMonths; $i++) {
$start = $i == 0 ? $startDate->copy()->addMonth($i) : $startDate->copy()->addMonth($i)->firstOfMonth();
$end = $diffInMonths == $i ? $endDate->copy() : $start->copy()->endOfMonth();
echo $end->format('Y-m') . ' ' . ($end->diffInDays($start) + 1) . PHP_EOL;
}
Let's say that I have two dates:
$initialDate = '08/10/2015 09:30:24 am';
$finalDate = '15/10/2015 15:47:38 pm';
$holiday = '12/10/2015';
I have to consider the hour of these days.
Hours to consider : 8 hours per day;
Start : 8 pm
End: 18 pm (24 hours format )
Lunch break start: 12:00 pm
Lunch break end: 14:00 pm
Example 1 : From 08/10/2015 10:00:00 to 09/10/2015 17:00:00 results 13 working hours. ( excludes lunch break )
Example 2 : From 08/10/2015 14:00:00 to 09/10/2015 18:00:00 results 12 working hours. ( Do not exclude 2 hours from begin date, because starts after 14:00 pm, lunch break )
Example 3 : From 08/10/2015 16:00:00 to 09/10/2015 18:00:00 results 10 working hours. ( Do not exclude 2 hours from begin date, because starts after 14:00 pmm lunch break )
Exampld 4 : From 08/10/2015 08:00:00 to 09/10/2015 11:00:00 results 14 working hours. ( Exclude 2 hours from begin date, and do not exclude 2 hours from end date, because isn't after 14:00 pm )
And I have to calculate the working hours and working days between those two dates, excluding weekends and Holidays, how can I do that ? I'm using PHP.
PS: I Already have something, but without lunch break... I made a research here on StackOverFlow.
Code:
function get_workdays($dataInicial,$dataFinal){
// arrays
$days_array = array();
$skipdays = array("Saturday", "Sunday");
$skipdates = get_feriados();
// other variables
$i = 0;
$current = $dataInicial;
if($current == $dataFinal) // same dates
{
$timestamp = strtotime($dataInicial);
if (!in_array(date("l", $timestamp), $skipdays)&&!in_array(date("Y-m-d", $timestamp), $skipdates)) {
$days_array[] = date("Y-m-d",$timestamp);
}
}
elseif($current < $dataFinal) // different dates
{
while ($current < $dataFinal) {
$timestamp = strtotime($dataInicial." +".$i." day");
if (!in_array(date("l", $timestamp), $skipdays)&&!in_array(date("Y-m-d", $timestamp), $skipdates)) {
$days_array[] = date("Y-m-d",$timestamp);
}
$current = date("Y-m-d",$timestamp);
$i++;
}
}
return $days_array;
}
function get_feriados(){
$dateAno = Date('Y');
$days_array = array(
$dateAno.'-10-12', // Padroeira do Brasil/ Dias das Crianças
$dateAno.'-11-02', // Finados
$dateAno.'-12-25' // Finados
);
return $days_array;
}
date_default_timezone_set('America/Sao_Paulo');
$dateAno = Date('Y');
$dataInicial = Date('08/10/2015 H:i');
$dataFinal = Date('13/10/2015 H:i');
// timestamps
$from_timestamp = strtotime(str_replace('/', '-', $dataInicial));
$to_timestamp = strtotime(str_replace('/', '-', $dataFinal));
// work day seconds
$workday_start_hour = 9;
$workday_end_hour = 17;
$workday_seconds = ($workday_end_hour - $workday_start_hour)*3600;
// work days beetwen dates, minus 1 day
$from_date = date('Y-m-d',$from_timestamp);
$to_date = date('Y-m-d',$to_timestamp);
$workdays_number = count(get_workdays($from_date,$to_date))-1;
$workdays_number = $workdays_number<0 ? 0 : $workdays_number;
// start and end time
$start_time_in_seconds = date("H",$from_timestamp)*3600+date("i",$from_timestamp)*60;
$end_time_in_seconds = date("H",$to_timestamp)*3600+date("i",$to_timestamp)*60;
// final calculations
$working_hours = ($workdays_number * $workday_seconds + $end_time_in_seconds - $start_time_in_seconds) / 86400 * 24;
print_r('<br/> Horas úteis '.$working_hours);
}
But don't consider two hours of break lunch. Can somebody please help me ?
If you use PHP 5.3 or higher, you can do this:
$datefrom = DateTime::createFromFormat('d/m/Y', '08/10/2015');
$dateto = DateTime::createFromFormat('d/m/Y', '15/10/2015');
$interval = $datefrom->diff($dateto);
$days = intval($interval->format('%a'));
Also you can remove holidays with if:
if ($datetime1->getTimestamp() < $holiday->getTimestamp() and $datetime2->getTimestamp() > $holiday->getTimestamp()) $days--;
Calculate hours between two days:
$datefrom = DateTime::createFromFormat('d/m/Y H:i:s', '08/10/2015 12:51:34');
$dateto = DateTime::createFromFormat('d/m/Y H:i:s', '15/10/2015 13:14:56');
$hours = intval($interval->format('%a')) * 24 + $interval->format('%h');
You can calculate hours of launches sum and then subtract it.
How to ignore weekends or calculate ignore days:
while($dateto->getTimestamp() > $datefrom->getTimestamp()) {
if (in_array($datefrom->format('w'), array('0','6'))) $ignore_days += 1;
$datefrom->modify('+1 day');
}
I expect this will do all you want. But I changed the datetime format as follows. Check it. Used less comments. If any query, please ask. Holidays are arrays, add and remove as required.
Times between 12:00 - 14:00 is handled.
Times below 08:00 is handled.
Times above 18:00 is handled.
<?php
$initialDate = '2015-10-13 08:15:00'; //start date and time in YMD format
$finalDate = '2015-10-14 11:00:00'; //end date and time in YMD format
$holiday = array('2015-10-12'); //holidays as array
$noofholiday = sizeof($holiday); //no of total holidays
//create all required date time objects
$firstdate = DateTime::createFromFormat('Y-m-d H:i:s',$initialDate);
$lastdate = DateTime::createFromFormat('Y-m-d H:i:s',$finalDate);
if($lastdate > $firstdate)
{
$first = $firstdate->format('Y-m-d');
$first = DateTime::createFromFormat('Y-m-d H:i:s',$first." 00:00:00" );
$last = $lastdate->format('Y-m-d');
$last = DateTime::createFromFormat('Y-m-d H:i:s',$last." 23:59:59" );
$workhours = 0; //working hours
for ($i = $first;$i<=$last;$i->modify('+1 day') )
{
$holiday = false;
for($k=0;$k<$noofholiday;$k++) //excluding holidays
{
if($i == $holiday[$k])
{
$holiday = true;
break;
} }
$day = $i->format('l');
if($day === 'Saturday' || $day === 'Sunday') //excluding saturday, sunday
$holiday = true;
if(!$holiday)
{
$ii = $i ->format('Y-m-d');
$f = $firstdate->format('Y-m-d');
$l = $lastdate->format('Y-m-d');
if($l ==$f )
$workhours +=sameday($firstdate,$lastdate);
else if( $ii===$f)
$workhours +=firstday($firstdate);
else if ($l ===$ii)
$workhours +=lastday($lastdate);
else
$workhours +=8;
}
}
echo $workhours; //echo the hours
}
else
echo "lastdate less than first date";
function sameday($firstdate,$lastdate)
{
$fmin = $firstdate->format('i');
$fhour = $firstdate->format('H');
$lmin = $lastdate->format('i');
$lhour = $lastdate->format('H');
if($fhour >=12 && $fhour <14)
$fhour = 14;
if($fhour <8)
$fhour =8;
if($fhour >=18)
$fhour =18;
if($lhour<8)
$lhour=8;
if($lhour>=12 && $lhour<14)
$lhour = 14;
if($lhour>=18)
$lhour = 18;
if($lmin == 0)
$min = ((60-$fmin)/60)-1;
else
$min = ($lmin-$fmin)/60;
return $lhour-$fhour + $min;
}
function firstday($firstdate) //calculation of hours of first day
{
$stmin = $firstdate->format('i');
$sthour = $firstdate->format('H');
if($sthour<8) //time before morning 8
$lochour = 8;
else if($sthour>18)
$lochour = 0;
else if($sthour >=12 && $sthour<14)
$lochour = 4;
else
{
$lochour = 18-$sthour;
if($sthour<=14)
$lochour-=2;
if($stmin == 0)
$locmin =0;
else
$locmin = 1-( (60-$stmin)/60); //in hours
$lochour -= $locmin;
}
return $lochour;
}
function lastday($lastdate) //calculation of hours of last day
{
$stmin = $lastdate->format('i');
$sthour = $lastdate->format('H');
if($sthour>=18) //time after 18
$lochour = 8;
else if($sthour<8) //time before morning 8
$lochour = 0;
else if($sthour >=12 && $sthour<14)
$lochour = 4;
else
{
$lochour = $sthour - 8;
$locmin = $stmin/60; //in hours
if($sthour>14)
$lochour-=2;
$lochour += $locmin;
}
return $lochour;
}
?>
Check the bellow code, that will return the number of Working days
function number_of_working_days($from, $to) {
$workingDays = [1, 2, 3, 4, 5];// date format = (1 = Monday,2 = Tue, ...)
$holidayDays = ['*-12-25', '*-02-14', '2015-12-23']; // variable and fixed holidays
$from = new DateTime($from);
$to = new DateTime($to);
$to->modify('+1 day');
$interval = new DateInterval('P1D');
$days = new DatePeriod($from, $interval, $to);
$no_of_working_days = 0;
foreach ($days as $day) {
if (!in_array($day->format('N'), $workingDays)||in_array($day->format('Y-m-d'), $holidayDays)||in_array($day->format('*-m-d'), $holidayDays)) {continue;}
$working_days++;
}
return $no_of_working_days;
}
echo number_of_working_days('2015-12-01', '2015-09-10');
From that you can easily calculate the Number of Working Hours.
I have created for you this nice class you can use. It requires the nesbot/carbon library (http://carbon.nesbot.com/) and you use it like so:
$calc = new HoursCalculator(
Carbon::createFromFormat("Y-m-d H:i", "2015-10-7 09:00"),
Carbon::createFromFormat("Y-m-d H:i", "2015-10-14 18:00"),
[
"2015-10-13"
]
);
echo $calc->getHours();
Heres the class:
class HoursCalculator {
const LUNCH_HOURS = 2;
protected $start;
protected $end;
protected $holidays;
protected $hoursTotal;
public function __construct(Carbon $start, Carbon $end, $holidays = [])
{
$this->start = $start;
$this->end = $end;
$this->holidays = $holidays;
}
public function getHours()
{
$dayHours = $this->getHoursInADay();
return $this->calculateHours($dayHours);
}
protected function getHoursInADay()
{
$start = $this->start;
$end = Carbon::createFromFormat("Y-m-d H:i", $this->start->format("Y-m-d") . " " . $this->end->format("H:i"));
return $start->diffInHours($end) - self::LUNCH_HOURS;
}
protected function getStartDate()
{
return $this->start->format('Y-m-d');
}
protected function calculateHours($hoursInDay)
{
$start = $this->start->copy()->startOfDay();
$end = $this->end->copy()->endOfDay();
$days = 0;
while($start->lt($end)) {
if (!$this->isHoliday($start) && !$this->isWeekend($start)) {
$days++;
}
$start->addDay(1);
}
return $days * $hoursInDay;
}
protected function isHoliday(Carbon $date)
{
$date->startOfDay();
foreach($this->holidays as $holiday) {
$holiday = Carbon::createFromFormat("Y-m-d", $holiday)->startOfDay();
if ($date->eq($holiday)) {
return true;
}
}
return false;
}
protected function isWeekend(Carbon $date)
{
return $date->isWeekend();
}
}
Hope this helps!
I have date ranges called from and to.I want to convert it to weeks.
Suppose from date is 1-10-2014 and to date is 31-10-2014
Then result is:
1st week : 01-10-2014 to 04-10-2014
2nd : 05-102014 to 11-10-2014
3rd : 12-10-2014 to 18-10-2014
4th : 19-10-2014 to 25-10-2014
5th : 26-10-2014 to 31-10-2014
In php.I try several code but that didn't given the absolute result only give 01 to 7 , 8 to 14 etc.
Pls help.
I already try answers from
Get the date of one week from today with PHP in stack overflow
date("Y-m-d",strtotime("+1 week"));
This snippet uses Sunday as the first day of the week:
$start = new DateTime('2014-10-01');
$end = new DateTime('2014-10-31 23:59');
$interval = new DateInterval('P1D');
$dateRange = new DatePeriod($start, $interval, $end);
$weekNumber = 1;
$weeks = array();
foreach ($dateRange as $date) {
$weeks[$weekNumber][] = $date->format('Y-m-d');
if ($date->format('w') == 6) {
$weekNumber++;
}
}
Each week will have all the days in it.
If you just want the first and last days of each week then you can just use array_shift and array_pop to get them. For example, for the first week you can use:
$wk1Start = array_shift($weeks[1]); //gives you first day of week 1
$wk1End = array_pop($weeks[1]); // give you the last day of week 1
If you want the start and end dates for each week, here is a way of doing it:
$ranges = array_map(function($week) {
return 'start: ' . array_shift($week)
. ', end: ' . array_pop($week); },
$weeks);
This is the output of $ranges for me:
Array
(
[1] => start: 2014-10-01, end: 2014-10-04
[2] => start: 2014-10-05, end: 2014-10-11
[3] => start: 2014-10-12, end: 2014-10-18
[4] => start: 2014-10-19, end: 2014-10-25
[5] => start: 2014-10-26, end: 2014-10-31
)
You can easily change the week starting day (set to Monday at the moment):
$fromDate = '2018-05-03';
$toDate = '2018-08-11';
$result = getWeekRanges($fromDate, $toDate);
array_walk_recursive($result, 'applyFormat');
echo '<pre>';
print_r($result);
echo '</pre>';
function getWeekRanges($start, $end) {
$timeStart = strtotime($start);
$timeEnd = strtotime($end);
$out = [];
$milestones[] = $timeStart;
$timeEndWeek = strtotime('next Monday', $timeStart);
while ($timeEndWeek < $timeEnd) {
$milestones[] = $timeEndWeek;
$timeEndWeek = strtotime('+1 week', $timeEndWeek);
}
$milestones[] = $timeEnd;
$count = count($milestones);
for ($i = 1; $i < $count; $i++) {
if( $i == $count - 1) {
$out[] = [
'start' => $milestones[$i - 1],
'end' => $milestones[$i]
];
}else{
$out[] = [
'start' => $milestones[$i - 1],
'end' => $milestones[$i] - 1
];
}
}
return $out;
}
function applyFormat(&$item) {
$item = date('Y-m-d', $item);
}
Try
$start_date = date('Y-m-d', strtotime('2014-10-01'));
$end_date = date('Y-m-d', strtotime('2014-10-31'));
$i=1;
for($date = $start_date; $date <= $end_date; $date = date('Y-m-d', strtotime($date. ' + 7 days'))) {
echo getWeekDates($date, $start_date, $end_date, $i);
echo "\n";
$i++;
}
function getWeekDates($date, $start_date, $end_date, $i) {
$week = date('W', strtotime($date));
$year = date('Y', strtotime($date));
$from = date("Y-m-d", strtotime("{$year}-W{$week}+1")); //Returns the date of monday in week
if($from < $start_date) $from = $start_date;
$to = date("Y-m-d", strtotime("{$year}-W{$week}-7")); //Returns the date of sunday in week
if($to > $end_date) $to = $end_date;
echo "$i th ".$from." to ".$to.'<br>';
}
output :-
1 th 2014-10-01 to 2014-10-05
2 th 2014-10-06 to 2014-10-12
3 th 2014-10-13 to 2014-10-19
4 th 2014-10-20 to 2014-10-26
5 th 2014-10-27 to 2014-10-31